Nicet level 2 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 2? On this page you'll find 333 study documents about Nicet level 2.

All 333 results

Sort by

Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass Popular
  • Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. - Answer-1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ - Answer-As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is ...
    (1)
  • $12.49
  • 4x sold
  • + learn more
NICET Fire Alarm Level 1 Exam Questions And Revised Correct  Answers Popular
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers

  • Exam (elaborations) • 14 pages • 2024 Popular
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - ANSWER : 21 feet At minimum, when working near power lines with voltage of 600 volts and lower, an aerial lift operator shall maintain which distance from the lines? - ANSWER : 10 feet The use of unprotected EMT shall be permitted under which conditions? - ANSWER : when in direct contact with t...
    (0)
  • $11.34
  • 2x sold
  • + learn more
NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
  • NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)

  • Exam (elaborations) • 46 pages • 2024
  • NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers) Q: A fire pump was installed in a low-rise residential building with a required fire alarm system. What are the requirements for the pump running signal? a. It shall be a supervisory signal. b. It shall be an alarm signal. c. It shall be a supervisory or alarm signal. d. A pump running signal is not required. Answer: c Q: A licensed electrician was hired to install duc...
    (0)
  • $10.99
  • 1x sold
  • + learn more
NICET Level 2 Full Exam Questions and Answers
  • NICET Level 2 Full Exam Questions and Answers

  • Exam (elaborations) • 64 pages • 2024
  • Available in package deal
  • NICET Level 2 Full Exam Questions and Answers You are inspecting a construction site and notice that the soil appears to be a fine- grained, cohesive material with good bearing capacity. What type of soil is this likely to be? a. Clay b. Sand c. Gravel d. Loam - Answer-a. Clay You are inspecting the clearing and grubbing of a construction site and notice that a large tree has been removed within the limits of disturbance. What should you do? a. Notify the project manager and request th...
    (0)
  • $14.49
  • 1x sold
  • + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024
  • Nicet Level 2: Concrete Exam Questions and Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nicet Level 2: Concrete Exam Questions and Answers 2024 What is the testing frequency for concrete? - Answer-every 50 yards When should you take cylinder samples? - Answer-Every 100 yards What are the components on a batch ticket? - Answer-1. Ticket Number 2. Plant 3. Project Number 4. Mix ID 5. Time of Batch 6. Time arrival 7. Time Discharge 8. Time Completed 9. Mix proportions When should concrete samples should not be taken? - Answer-Before 10% and 90% of truck has been discharge...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET Level 2 ITM of Water Based Systems Questions and Answers 100% Pass
  • NICET Level 2 ITM of Water Based Systems Questions and Answers 100% Pass

  • Exam (elaborations) • 23 pages • 2023
  • NICET Level 2 ITM of Water Based Systems Questions and Answers 100% Pass When placing a LOTO on a system, how many locks should be applied? As many locks as their are personnel working on the system. A ladder must be able to support ____ times the weight of the expected load 3.3 It is acceptable to enter into a confined space without an attendant, but only if all other precautions and PPE are taken. False A defective air pressure gauge on the supply air of a dry pipe system is considered a __...
    (0)
  • $9.99
  • 1x sold
  • + learn more
NICET Level 2 ITM of Water Based Systems Questions and Answers(A+ Solution guide)2024 update
  • NICET Level 2 ITM of Water Based Systems Questions and Answers(A+ Solution guide)2024 update

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • When placing a LOTO on a system, how many locks should be applied? - As many locks as their are personnel working on the system. A ladder must be able to support ____ times the weight of the expected load - 3.3 It is acceptable to enter into a confined space without an attendant, but only if all other precautions and PPE are taken. - False A defective air pressure gauge on the supply air of a dry pipe system is considered a _____ - Critical deficiency When taking a sprinkler system out of...
    (0)
  • $7.99
  • 1x sold
  • + learn more
NICET Level 2 ITM of Water Based Systems | 155 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • NICET Level 2 ITM of Water Based Systems | 155 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 14 pages • 2023
  • When placing a LOTO on a system, how many locks should be applied? - As many locks as their are personnel working on the system. A ladder must be able to support ____ times the weight of the expected load - 3.3 It is acceptable to enter into a confined space without an attendant, but only if all other precautions and PPE are taken. - False A defective air pressure gauge on the supply air of a dry pipe system is considered a _____ - Critical deficiency When taking a sprinkler system out of...
    (0)
  • $15.49
  • 1x sold
  • + learn more
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024 Chapter 1 - Answer-Administration Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) Chapter 3 - Answer-Definitions Chapter 4 - Answer-General Requirements (Owner's Chapter) Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF Systems, Dry Pipe Systems) Chapter 6 - Answer-Standpipe & Hose Systems Chapter 7 - Answer-Hydra...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION  EXAMS WITH ACTUAL CORRECT QUESTIONS  AND VERIFIED DETAILED RATIONALES  ANSWERS LATEST 2024 [NEWEST] ALREADY  GRADED A+
  • NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED RATIONALES ANSWERS LATEST 2024 [NEWEST] ALREADY GRADED A+

  • Exam (elaborations) • 56 pages • 2024
  • NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED RATIONALES ANSWERS LATEST 2024 [NEWEST] ALREADY GRADED A+
    (1)
  • $20.49
  • 1x sold
  • + learn more
NICET Level 1 Water-Based Systems (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
  • NICET Level 1 Water-Based Systems (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)

  • Exam (elaborations) • 38 pages • 2024
  • NICET Level 1 Water-Based Systems (Latest Update) Qs & As| 100% Correct| Grade A (Verified Answers) Q: What type of valve is designed for the purpose of reducing downstream water pressure under both residual and static conditions Answer: Pressure reducing valve Q: PIV and OS&Y shall be backed a __________ turn from the fully open position to prevent jamming. Answer: 1/4 Q: Gauges not accurate to within _______ percent of the full scale shall be recalibrated or repl...
    (0)
  • $10.99
  • 1x sold
  • + learn more