Permit technician - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Permit technician? On this page you'll find 758 study documents about Permit technician.

All 758 results

Sort by

ICC Permit Technician Practice Exam Questions With Complete Solutions Popular
  • ICC Permit Technician Practice Exam Questions With Complete Solutions

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ICC Permit Technician Practice Exam Questions With Complete Solutions
    (0)
  • $12.49
  • 2x sold
  • + learn more
Z-51 Written Exam Questions and Complete Solutions. Popular
  • Z-51 Written Exam Questions and Complete Solutions.

  • Exam (elaborations) • 37 pages • 2024 Popular
  • Z-51 Written Exam Questions and Complete Solutions In a steam turbine, what is the function of a Kingsbury thrust bearing? A) Maintain first stage steam pressure. B) Compensate for coupling misalignment. C) Adjust shaft torque at start up. D) Maintain axial positioning of the rotor shaft. - Answer: D) Maintain axial positioning of the rotor shaft. The ratio of actual pressure of water pressure in the atmosphere to the saturated pressure of given temperature is A) partial pressure....
    (0)
  • $13.49
  • 1x sold
  • + learn more
ICC Permit Technician Study Companion Questions With Complete Solutions
  • ICC Permit Technician Study Companion Questions With Complete Solutions

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • ICC Permit Technician Study Companion Questions With Complete Solutions
    (0)
  • $12.49
  • 1x sold
  • + learn more
Permit Technician Questions and Answers | Latest Update | 2024/2025 |  Graded A+
  • Permit Technician Questions and Answers | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 21 pages • 2024
  • Permit Technician Questions and Answers | Latest Update | 2024/2025 | Graded A+ What is the primary role of a permit technician in the construction process? The primary role of a permit technician is to review, process, and issue permits for construction projects while ensuring compliance with local codes and regulations. How do permit technicians ensure that applications meet the necessary regulatory requirements? Permit technicians carefully review submitted applications and sup...
    (0)
  • $9.91
  • + learn more
Permit Technician/ 106 Questions & Verified Solutions/ Already Graded A+
  • Permit Technician/ 106 Questions & Verified Solutions/ Already Graded A+

  • Exam (elaborations) • 14 pages • 2024
  • Permit Technician/ 106 Questions & Verified Solutions/ Already Graded A+ Terms like: Who grants the authority to adopt codes? - Answer: The federal gov't What are the two types of construction regulations? - Answer: Performance & prescriptive An adopted code may become invalid if _______. - Answer: It prohibits alternative methods or materials A written description that spells out the qualitative requirements for products, materials and workmanship including installation, testing...
    (0)
  • $9.29
  • + learn more
Permit Technician Training Exam Questions Fully Solved.
  • Permit Technician Training Exam Questions Fully Solved.

  • Exam (elaborations) • 9 pages • 2024
  • The federal gov't - Answer Who grants the authority to adopt codes? Performance & prescriptive - Answer What are the two types of construction regulations? It prohibits alternative methods or materials - Answer An adopted code may become invalid if _______. Specification - Answer A written description that spells out the qualitative requirements for products, materials and workmanship including installation, testing & performance criteria for a proposed project is known as ...
    (0)
  • $9.69
  • + learn more
Texas Barber Exam Practice Test Latest 2024 Graded A+
  • Texas Barber Exam Practice Test Latest 2024 Graded A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Texas Barber Exam Practice Test Latest 2024 Graded A+ Keratin - Answer ️️ -Hair and nails are chiefly composed of a horny substance called? Quo vidas - Answer ️️ -An even and smooth brush out cut over the entire head is called? Emery board - Answer ️️ -Which of the following is an implement? Brush the hair - Answer ️️ -What should be done after draping the client? Every two years - Answer ️️ -How often must a barber, manicurist or barber technician license be renewed? ...
    (1)
  • $11.49
  • 1x sold
  • + learn more
ICC PERMIT TECHNICIAN EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
  • ICC PERMIT TECHNICIAN EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

  • Exam (elaborations) • 13 pages • 2024
  • The federal gov't - ACCURATE ANSWERS Who grants the authority to adopt codes? Performance & prescriptive - ACCURATE ANSWERS What are the two types of construction regulations? It prohibits alternative methods or materials - ACCURATE ANSWERS An adopted code may become invalid if _______. Specification - ACCURATE ANSWERS A written description that spells out the qualitative requirements for products, materials and workmanship including installation, testing & performance criteria for a p...
    (0)
  • $13.49
  • + learn more
2024 ICC Permit Technician - Legal Aspects exam questions and answers
  • 2024 ICC Permit Technician - Legal Aspects exam questions and answers

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • What is/are the most important document(s) that a code official and building department have to determine what the building or contractor is doing on site? I. Building Permit II. International Zoning Code III. International Building Code IV. Application for Building Permit I and IV only Reference(s): 2002 Legal Aspects of Code Administration pg. 32 Which of the following documents should not be accepted by a building department? A. The name and address of the contractor that...
    (0)
  • $14.99
  • + learn more
ICC PERMIT TECHNICIAN EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
  • ICC PERMIT TECHNICIAN EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

  • Exam (elaborations) • 11 pages • 2024
  • In a Factory/Industrial (F1) ZONE, division 2, the minimum lot width is __________ the minimum lot depth is __________ feet respectively. A. 50, 75 B. 75, 100 C. 100, 125 D. 125, 200 - ACCURATE ANSWERS B. 75, 100 No sign other than an official traffic sign shall be erected within __________ feet of the lines of any street. A. 2 B. 4 C. 5 D. 8 - ACCURATE ANSWERS A. 2 For any use contrary to any building or parcel of land regulated by the International Zoning Code, the Code Offic...
    (0)
  • $14.89
  • + learn more
Permit Technician Study Guide Exam And Actual Answers.
  • Permit Technician Study Guide Exam And Actual Answers.

  • Exam (elaborations) • 7 pages • 2024
  • Plans and specifications necessary for obtaining a permit are known as... - Answer Construction Documents __________________ is a(n) written description that spells out the qualitative requirements for products, materials and workmanship including installation, testing and performance criteria for a proposed project. - Answer Building Code Architectural material symbols are... - Answer Pictorial representations of construction materials The architectural abbreviation "FFL" si...
    (0)
  • $9.99
  • + learn more