Pjm gen test - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm gen test? On this page you'll find 7 study documents about Pjm gen test.
All 7 results
Sort by
-
PJM Gen Test Questions & Answers 2024
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
PJM Gen Test Questions & Answers 2024 
 
 
If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - ANSWER-59.98 
 
What is the PJM regulation requirement for the off-peak period? - ANSWER-525 
 
Which of the following PJM reserves are NOT synchronized? - ANSWER-Non-synchronized (quick-start) 
 
What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assignin...
-
PJM Test Questions - Answered (Complete Solutions)
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $23.99
- + learn more
PJM Test Questions - Answered (Complete Solutions) Which of the following statements are true concerning delays in restoring power to offline generation? a. the unit could suffer turbine shaft damage b. fuel oil for the unit could congeal c. startup time for the unit will be reduced d. the battery life used to maintain critical systems may run out During system restoration, you re-energize a fairly long distribution load circuit that has been off for several hours and notice that the loading i...
-
PJM Generation Cert Practice Exam Graded A+.
- Exam (elaborations) • 24 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
Actions in low voltage alert? - correct answer Review transmission & generation outages 
Request reactive reserve check 
 
Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - correct answer Bulk Power System 
 
Manual load dump warning & reduction of Non-critical plant load issued when? - correct answer Primary reserve is less the the largest generating unit. 
Loss of transmission facility jeopardize reliability after all possible measures...
-
PJM Test Questions Well Answered And Graded A+.
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - correct answer Dynamic Instability 
 
If PJM experienced an event...
-
PJM Gen Test
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
Want to regain your expenses?
-
PJM Generation Dispatcher Exam Practice With 100% Verified Correct Answers.
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by special equipm...
-
PJM Generation Dispatcher Exam PRACTICE
- Exam (elaborations) • 5 pages • 2023
-
- $4.49
- + learn more
PJM Generation Dispatcher Exam 
PRACTICE 
An EXCITER on a traditional generator does what? - CORRECT ANSWER-Voltage 
regulation (AVR) if you change the excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - CORRECT 
ANSWER-Limits 
When synchronizing to the interconnection, what needs to be synchronized? - 
CORRECT ANSWER-Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - CORRECT 
ANSWER-...