Pjm go - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm go? On this page you'll find 9 study documents about Pjm go.
All 9 results
Sort by
-
PJM GO Exam Questions And Verified Detailed Answers
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM GO Exam Questions And Verified Detailed Answers...
-
PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $14.29
- + learn more
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual 
implementation. 
: c. 4 hours 
The following would be considered non-critical plant load (Select 2) 
: A. Office Area Air Conditioners 
C. Lighting 
During a Cold Weather Alert, PJM will take which of the actions 
: D. Assume an unavailability rate for schedule generation 
When PJM issues a High System Voltage Message, the GO should have its units 
operate at: 
: B. The lower end of their voltage bandwidth 
What wou...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
Want to regain your expenses?
-
PJM Generator Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generator Exam Questions and Answers 
The purpose of the Deploy All Resources Action is to instruct all generating resources 
to be on line and at full output _________ - Correct Answer ️️ -immediately upon 
receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators 
are in service 
PJM can issue the Deploy All Resources Action for________ - Correct Answe...
-
PJM Practice questions With Explanation of Answers.
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - correct answer c. 4 hours 
 
The following would be considered non-critical plant load (Select 2) - correct answer A. Office Area Air Conditioners 
C. Lighting 
 
During a Cold Weather Alert, PJM will take which of the actions - correct answer D. Assume an unavailability rate for schedule generation 
 
When PJM issues a High System Voltage Message, the GO should have its units operate at: - correct an...
-
ARE 5.0 - PJM - Project Execution verified answers and questions 2023.
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
ARE 5.0 - PJM - Project Execution verified answers and questions 2023. 
 
 
 
 
 
 
 
 
 
Best approach to meeting client expectations for construction budgets - correct ully monitor the relationship between scope, quality, and cost as a design is being developed 
When a conflict, sit with the client and review and adjust one or more of the project parameters of quality, time, and cost before proceeding to the next step in the design process 
To stay on top of issue, budget compliance & adjustme...
-
NVR FINAL EXAM STUDY GUIDE (MODULE 3 FRAMING) QUESTIONS AND ANSWERS WITH SOLUTIONS 2024
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Out of the following, what should a PJM check on every lumber load audit? Select all that apply: - ANSWER 1. Mudsill material 
2. Blueprints 
3. Safety material 
 
Green Paint is Framing Safety Material. True or false? - ANSWER Each element of the lumber package is marked with a color coding system to make it easier for framing crews to identify what material is for what purpose. For Example: Orange is for safety material, Green is for 1st floor material and Blue is for 2nd floor material. 
 
Wh...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia