Purpose of economizer Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Purpose of economizer? On this page you'll find 84 study documents about Purpose of economizer.

All 84 results

Sort by

COMPRESSORS UNIT 23 EXAM 1 QUESTIONS WITH COMPLETE SOLUTIONS
  • COMPRESSORS UNIT 23 EXAM 1 QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 8 pages • 2024
  • COMPRESSORS UNIT 23 EXAM 1 QUESTIONS WITH COMPLETE SOLUTIONS Purpose of Economizer - Answer-Reduces flash gas by having a 2 stage pressure drop through float section Capacity control of centrifugal compressors - Answer-Speed control Butterfly damper Variable inlet vanes Compression factors that affect efficiency - Answer-piston/compressor displacement suction/discharge valves number of cylinders clearance pocket (size) Speed Suction/discharge pressures Types of refrigerant used...
    (0)
  • $12.99
  • + learn more
ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A)
  • ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A)

  • Exam (elaborations) • 269 pages • 2024
  • ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A) CHAPTER 1 - Number of questions on exam - 7 Chapter 1 Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour a. 2300 kg to 65000 kg per hour The main advantage of the packaged boiler is its _____ _____. a. small size b. compact design c. low cost d. quality st...
    (0)
  • $16.99
  • + learn more
ABSA B1 Study Bank Questions with 100% correct Answers
  • ABSA B1 Study Bank Questions with 100% correct Answers

  • Exam (elaborations) • 104 pages • 2024
  • Available in package deal
  • ABSA B1 Study Bank Questions with 100% correct Answers Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - answerA The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - answerC Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more - answerD Where electri...
    (0)
  • $16.49
  • + learn more
Refrigeration-Air Conditioning  Questions and Answers | New  One | Grade A+
  • Refrigeration-Air Conditioning Questions and Answers | New One | Grade A+

  • Exam (elaborations) • 48 pages • 2024
  • Available in package deal
  • 1. When repairing a refrigeration system, a swaging tool set would be used to carry out which of the following operations? Ans: Swaging tools can be used to expand an end of one tube to fit onto a tube of the same original outside diameter. 2. In a refrigeration system that is not protected by a water failure switch, if the cooling water to the condenser fails, what will be the result for protective purposes? Ans: the compressor will shut down by the action of the high-pressure cutout s...
    (0)
  • $15.29
  • + learn more
Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED)
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 10 pages • 2024
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED) Boiler overload capacity is normally what percentage of boiler full power capacity? - Answer 120% A pressure specified by the boiler manufacturer as a criterion for the boiler design is termed as? - Answer Design pressure What is the minimum steam drum pressure on an operating boiler? - Answer 85% of boiler operating pressure What is the minimum steam drum pressure on an operating boiler...
    (0)
  • $14.49
  • + learn more
ABSA B1 Study Bank Questions And Answers With Complete Solution Rated A+>>2024
  • ABSA B1 Study Bank Questions And Answers With Complete Solution Rated A+>>2024

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more - D Where electric power is used as a heating source, the boiler rating shall be ...
    (0)
  • $12.49
  • + learn more
ABSA B1 Study Bank Questions And Answers With Complete Solution Rated A+>>2024
  • ABSA B1 Study Bank Questions And Answers With Complete Solution Rated A+>>2024

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more - D Where electric power is used as a heating source, the boiler rating shall be ...
    (0)
  • $12.49
  • + learn more
Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED)
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 10 pages • 2024
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED) The number of pounds of steam generated per hour at the pressure and temperature required for all purposes to develop contract shaft horsepower of the ship divided by the numbers of boilers installed is defined as? - Answer Boiler full power capacity Boiler overload capacity is normally what percentage of boiler full power capacity? - Answer 120% A pressure specified by the boiler manufac...
    (0)
  • $12.99
  • + learn more
ABSA B1 Study Bank Questions with 100% Correct
  • ABSA B1 Study Bank Questions with 100% Correct

  • Exam (elaborations) • 134 pages • 2024
  • Available in package deal
  • ABSA B1 Study Bank Questions with 100% Correct Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - Answer- A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - Answer- C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more - Answer- D Where electric p...
    (0)
  • $15.49
  • + learn more
Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED Answers)
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED Answers)

  • Exam (elaborations) • 10 pages • 2024
  • Main propulsion Boiler Operation Exam Questions With Correct Answers, Latest Updated 2024/2025 (GRADED Answers) The number of pounds of steam generated per hour at the pressure and temperature required for all purposes to develop contract shaft horsepower of the ship divided by the numbers of boilers installed is defined as? - Answer Boiler full power capacity Boiler overload capacity is normally what percentage of boiler full power capacity? - Answer 120% A pressure specified by the boiler...
    (0)
  • $12.99
  • + learn more