Slab volume Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Slab volume? On this page you'll find 201 study documents about Slab volume.
All 201 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
Basic Appraisal Procedures – McKissock test questions with verified solutions 2024.
- Exam (elaborations) • 19 pages • 2024 Popular
- Available in package deal
-
- $15.49
- 1x sold
- + learn more
Valuation process 
A systematic procedure used in the valuation of real property. 
 
Steps: 
1: Define the problem 
 
2:Determine scope of work 
 
3:Gather, record, and verify the data 
 
4:Determine the highest and best use 
 
5:Estimate the land value 
 
6:Estimate value by each of the three approaches (if applicable) 
 
7:Reconcile the estimated values into the final opinion of value 
 
8:Report the final opinion of value 
 
 
 
Client 
The party or parties who engage, by employment or contra...
-
Michigan Builders License Exam Questions With Correct Answers
- Exam (elaborations) • 71 pages • 2023
- Available in package deal
-
- $13.49
- 6x sold
- + learn more
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) 
 
Administrative - Answer First 2 chapters of code book are 
 
True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F 
 
Yes - Answer Does the building official have the authority to render interpretations o...
-
FULL NHIE EXAM PRACTICE - Questions and Answers (Complete Solutions)
- Exam (elaborations) • 83 pages • 2024
-
- $28.49
- 1x sold
- + learn more
FULL NHIE EXAM PRACTICE - Questions and Answers (Complete Solutions) Where you have found evidence of footing settlement, how can you predict whether there will be further settlement? (a) You can count the number of planes of movement. (b) You can determine the type of foundation material. (c) You cannot predict settlement from a single inspection. (d) You can determine the depth of the footing. You typically identify a Freon leak (a) As an oil stain (b) As refrigerant coming out of the Freon ...
-
Building Construction Exam 2 with correct answers 2024
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $7.99
- 1x sold
- + learn more
What is not a type of deep foundation? - answer-spread footing 
 
What would be constructed with a flared bottom when used in clay soil to improve its bearing capacity? - answer-belled caisson 
 
What pile would have one of the lowest capacity based strength of the material it is made from? - answer-Timber pile 
 
What type of portland cement should be used in a concrete mix when the concrete must gain strength as fast as possible so that a contractor can strip forms as soon as possible? - answe...
Fear of missing out? Then don’t!
-
ACI Certification / Concrete Flatwork Tech and Flatwork Finisher Exam tested Questions With Correct Reviewed Answers Chapter #1-#10
- Exam (elaborations) • 32 pages • 2024
-
- $12.99
- + learn more
ACI Certification / Concrete 
Flatwork Tech and Flatwork 
Finisher Exam tested Questions 
With Correct Reviewed Answers 
Chapter #1-#10 
(Ch. 1, #1) It is important that the _______ _______ read 
and understand project specifications - ANSWER : 
finishing foreman 
(Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) 
of concrete per hour, the producer's rate should be about 
____ yd^3(m^3) per hour. - ANSWER : 100 
(Ch 1, #3) True or False: Concrete is sold by the ton. - 
ANSWER...
-
Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) 100% Pass
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Concrete Flatwork Tech and Flatwork 
Finisher (3rd Ed.) 100% Pass 
 
(Ch. 1, #1) It is important that the _______ _______ read and understand project specifications 
finishing foreman 
 
(Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer's 
rate should be about ____ yd^3(m^3) per hour. 100 
 
(Ch 1, #3) True or False: Concrete is sold by the ton. False (sold by volume) 
 
(Ch. 1, #4) Delays in discharging concrete trucks can result in the concrete bein...
-
LARE Exam 4 2024 with 100% correct answers
- Exam (elaborations) • 25 pages • 2024
-
Available in package deal
-
- $16.49
- + learn more
These materials determine the compressive strength of concrete - correct answer water & cement 
 
Aggregate size in concrete should not exceed - correct answer 1/3 the depth of the slab 
 
Machine bolt assembly - correct answer used to connect metal to metal 
 
Demo Plan must always include - correct answer -Survey base w/ existing site elements 
-Limits of work 
-Hardscape to be removed 
 
Primary determinant of retaining wall's footing - correct answer soil bearing capacity 
 
Soil ...
-
ACI Certification: Concrete Flatwork Tech and Flatwork Finisher (2nd Ed.)2024/2025
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $19.99
- + learn more
ACI Certification: Concrete Flatwork Tech and Flatwork Finisher (2nd Ed.) 
finishing foreman - correct answer (Ch. 1, #1) It is important that the _______ _______ read and understand project specifications 
 
100 - correct answer (Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer's rate should be about ____ yd^3(m^3) per hour. 
 
False (sold by volume) - correct answer (Ch 1, #3) True or False: Concrete is sold by the ton. 
 
pump, place, and finish - ...
-
Praxis 5135 Art: Content & Analysis Latest Update Graded A+
- Exam (elaborations) • 136 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Praxis 5135 Art: Content & Analysis 
 
Latest Update Graded A+ 
 
Relief A projecting design carved or modeled on a flat background 
 
Perspective A technique for representing space and 3-dimensional objects on a flat, 2- 
dimensional surface by suggesting depth or distance 
 
Figurative Style that accurately represents figures, animals, or other recognizable objects 
 
Graphic Art on a flat surface based on drawing and use of line; especially applied to 
printmaking 
 
Plane A flat, 2-dimension...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia