Swm inspector Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Swm inspector? On this page you'll find 11 study documents about Swm inspector.
All 11 results
Sort by
-
SWM Inspector Exam Guide 2024
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $10.99
- + learn more
Activities exempt from CBPA (p.7) - -permitted surface or deep mining, oil and gase operations 
-clearing of lands for agriculture, forestry, etc. 
-single family residential less than 1 acre (w/ exceptions) 
-discharges to sanitary sewer or combined sewer system 
-activities to turn abandon properties into agricultural 
-routine maintenance, etc. 
-land-disturbing activities in response to public emergency 
 
Construction GP Operator meets either of these two criteria (p.8) - 1. Direct operatio...
-
VA DEQ SWM Inspector Exam Latest Version 2024/2025 Expert-Verified Q&As
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
A locality VSMP must be at least as stringent as what state permit? - The construction GP 
A SWM Plan must be approved by who prior to land disturbance? - the VSMP Program Authority 
all SWPPP requirements may be met by - incorporating other plans into reference, or by developing 
missing elements. 
At what % impervious cover are streams substantially affected? - 25% 
BMPs use these three mechanisms to control pollution: - Infiltration, settling, and vegetative uptake 
Co-located practices - Dur...
-
SWM Inspector Pre Test Questions And Correct Answers
- Exam (elaborations) • 6 pages • 2024
-
- $9.99
- + learn more
SWM Inspector Pre Test Questions 
And Correct Answers 
Activities exempt from CBPA (p.7) - CORRECT ANS : -permitted 
surface or deep mining, oil and gase operations 
-clearing of lands for agriculture, forestry, etc. 
-single family residential less than 1 acre (w/ exceptions) 
-discharges to sanitary sewer or combined sewer system 
-activities to turn abandon properties into agricultural 
-routine maintenance, etc. 
-land-disturbing activities in response to public emergency 
Construction GP ...
-
SWM Inspector Pre Test Questions And Correct Answers
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
SWM Inspector Pre Test Questions 
And Correct Answers 
Activities exempt from CBPA (p.7) - CORRECT ANS : -permitted 
surface or deep mining, oil and gase operations 
-clearing of lands for agriculture, forestry, etc. 
-single family residential less than 1 acre (w/ exceptions) 
-discharges to sanitary sewer or combined sewer system 
-activities to turn abandon properties into agricultural 
-routine maintenance, etc. 
-land-disturbing activities in response to public emergency 
Construction GP ...
-
DEQ SWM Inspector with complete solution
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
DEQ SWM Inspector with complete solution
Too much month left at the end of the money?
-
SWM Exam (Program Administrator, Inspector and Plan reviewer) Questions With 100% Correct Answers.
- Exam (elaborations) • 6 pages • 2024
-
- $12.99
- + learn more
SWM Exam (Program Administrator, Inspector and Plan reviewer) Questions With 100% Correct Answers.
-
WM Inspector OTHER Questions With 100% Correct Answers.
- Exam (elaborations) • 5 pages • 2024
-
- $7.99
- + learn more
Activities exempt from CBPA (p.7) - Answer--permitted surface or deep mining, oil and gase 
operations 
-clearing of lands for agriculture, forestry, etc. 
-single family residential less than 1 acre (w/ exceptions) 
-discharges to sanitary sewer or combined sewer system 
-activities to turn abandon properties into agricultural 
-routine maintenance, etc. 
-land-disturbing activities in response to public emergency 
Construction GP Operator meets either of these two criteria (p.8) - Answer-1. Di...
-
DEQ ESC Inspector Exam Questions And Correct Answers
- Exam (elaborations) • 5 pages • 2024
-
- $7.99
- + learn more
DEQ ESC Inspector Exam 
Questions And Correct Answers 
Which two plans in the SWPPP must be approved? - CORRECT 
ANS : Erosion and Sediment control plans and stormwater 
management plans. 
Does the stormwater management plan address runoff during 
construction or after? - CORRECT ANS : The stormwater 
management plan addresses post-construction stormwater runoff. 
What impact does impervious cover have on water quality? - 
CORRECT ANS : The volume and velocity of stormwater runoff 
increase...
-
COMBINED SWM Participant Guide Questions with Answers Top Graded 2024
- Package deal • 8 items • 2024
-
- $31.49
- + learn more
COMBINED SWM Participant Guide Questions with Answers Top Graded 2024
-
DEQ SWM Inspector
- Exam (elaborations) • 3 pages • 2024
-
- $7.99
- + learn more
DEQ SWM Inspector
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia