logo-home

Concrete study materials for exams,study guides,notes,summaries and study quizes.

Hello , I am very friendly and experienced tutor dedicated to my teaching work. If you need any kind of help then you can contact me with any questions about your course .I can help you with everything - tests, quizzes, exams, db threads and so on. Just ask me if you want to get an A on your courses.







Anyway Welcome to Tutoring with Experience and Enthusiasm! I am thrilled to have the opportunity to help you with best study guides and assignments. Be prepared.

Community

  • Followers
  • Following

68 Reviews received

10323 items

HESI EXAM 2 Questions with Complete Answers.

(0)
$20.49
0x  sold

HESIEXAM2QuestionswithCompleteAnswers. The nurse is completing the admission assessment of a 3-year-old who is admitted with bacterial meningitis and hydrocephalus. Which assessment finding is evidence that the child is experiencing increased intracranial pressure? a. Tachycardia and tachypnea b. Sluggish and unequal pupillary responses c. Increased head circumference d. Blood pressure fluctuations and syncope - Correct Answer b. Sluggish and unequal pupillary responses A client with ac...

i x
  • Exam (elaborations)
  •  • 43 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

Hesi Exam 5 Questions with Verified Answers-2024.

(0)
$17.99
0x  sold

HesiExam5QuestionswithVerifiedAnswers-2024. The parietal peritoneum is what type of membrane? Connective. Mucous. Serous. Synovial. - Correct Answer Serous. When removing sutures from a well healed wound, at what location will the medical assistant (MA) cut the suture? The side closest to the skin below the knot. Above the knot. The side farthest from the skin. Any location on the suture. - Correct Answer The side closest to the skin below the knot. Which is considered a lymphoid org...

i x
  • Exam (elaborations)
  •  • 21 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

Agile Mock test - Team Performance 3 Exam Questions and Correct Answers.

(0)
$18.49
0x  sold

Agile Mock test- Team Performance 3Exam Questions and Correct Answers. What is the team space" for your project?" A. The place where the team members are physically located B. The digital tools used to create virtual osmotic communication C. The most central or primary location for your distributed team D. The mental focus needed to work effectively as a team - Correct Answer A. The place where the team members are physically located Explanation The team space" is the place whe...

i x
  • Exam (elaborations)
  •  • 12 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

PMI-ACP Examination Prep Questions and Correct Answers.

(0)
$17.99
0x  sold

PMI-ACPExaminationPrepQuestionsandCorrect Answers. How many domain areas are covered on the exam? - Correct Answer 1) Agile Principles and Mindset (16%) 2) Value-driven Delivery (20%) 3) Stakeholder Engagement (17%) 4) Team Performance (16%) 5) Adaptive Planning (12%) 6) Problem Detection and Resolution (10%) 7) Continuous Improvement (Product, Process, People) (9%) How much does it cost to retake the PMI-ACP? - Correct Answer PMI Member Status (US Dollars) *member ($335) *nonmembe...

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

CAPM Exam Part 1 WITH 165 Questions and Correct Answers.

(0)
$17.99
0x  sold

CAPMExamPart1WITH165QuestionsandCorrect Answers. A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Correct Answer The PMI publication that defines widely accepted project management practices. The CAPM and the PMP exam are largely based on this book. Abusive manner - Correct Answer Treating others with conduct that may result in harm, fear, humiliation, manipulation, or exploitation. For example, berating a project team member because they have taken longer than expected...

i x
  • Exam (elaborations)
  •  • 14 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

CAPM PMI PRACTICE EXAM QUESTIONS AND ANSWERS.

(0)
$18.99
0x  sold

CAPMPMIPRACTICEEXAMQUESTIONSAND ANSWERS. what describes the approved version of the time-phased project budget, excluding any management reserves, which can be changed only though formal change control procedures and is used as a basis for comparison to actual results? - Correct Answer Cost Baseline The following are all key competencies of a project manager except: - Correct Answer Operational Management As an output of the Monitor Risks process, an updated risk register generally inclu...

i x
  • Exam (elaborations)
  •  • 34 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

PMP Exam Prep 76 Questions with Answers-Latest Update 2024.

(0)
$17.99
0x  sold

PMPExamPrep76QuestionswithAnswers-Latest Update 2024. Schedule Development/Project Time Management - Correct Answer Analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule Activity Duration Estimating/Project Time Management - Correct Answer Estimating the number of work periods that will be needed to complete individual schedule activities Activity Resource Estimating/Project Time Management - Correct Answer Estimating the ...

i x
  • Exam (elaborations)
  •  • 7 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

PMI PBA-BA Glossary Exam Questions and Answers-Latest Update 2024.

(0)
$17.99
0x  sold

PMIPBA-BAGlossaryExamQuestions andAnswers-Latest Update 2024. Return on Investment (ROI) - Correct Answer The percent return on an initial investment, calculated by taking the projected average of all net benefits and dividing them by the initial cost. Risk Appetite - Correct Answer The degree of uncertainty an organization or individual is willing to accept in anticipation of a reward. Risk Burndown Chart - Correct Answer On adaptive projects, used to show the status of risks across ite...

i x
  • Exam (elaborations)
  •  • 29 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

PMI-PBA - Tools and Techniques by Category Latest Exam Questions and Answers.

(0)
$17.99
0x  sold

PMI-PBA-Tools andTechniquesbyCategoryLatestExam QuestionsandAnswers. Elicitation Tools and Techniques - ANS Tools and techniques used to draw out requirements and assumptions from stakeholders through individual and group settings and from existing documentation Types of Elicitation Tools and Techniques - ANS Brainstorming Document Analysis Facilitated Workshops Focus Groups Interviews Non-Functional Requirements Analysis Observation Prototypes Surveys'Questionnaires Domains whi...

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x

CAPM Practice Test Questions with 100 % Verified Answers.

(0)
$17.99
0x  sold

CAPMPracticeTestQuestionswith100%Verified Answers. What is OPM3 - Correct Answer A PMI model designed to help organizations determine their level of maturity in project management (Organizational Project Management Maturity Model) Management by Obectives - Correct Answer process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement. Employee and supervisor meet to discuss the objectives of...

i x
  • Exam (elaborations)
  •  • 3 pages • 
  • by Lectjoe • 
  • uploaded  2024
Quick View
i x