Package deal
National Commission for the Certification of Crane Operators (NCCCO) Tests Bundle
National Commission for the Certification of Crane Operators (NCCCO) Tests Bundle
[Show more]National Commission for the Certification of Crane Operators (NCCCO) Tests Bundle
[Show more]Boom up - Answer What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - Answer When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for...
Preview 2 out of 6 pages
Add to cartBoom up - Answer What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - Answer When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for...
1x sold
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer c. 
 
2. When hoisting personnel, within what percentage of level mu...
Preview 3 out of 20 pages
Add to cart1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer c. 
 
2. When hoisting personnel, within what percentage of level mu...
1x sold
Before leveling a mobile crane on outriggers, an operator should ensure: - Answer there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Answer Keeping 90 degree angle between cylinder ro...
Preview 2 out of 14 pages
Add to cartBefore leveling a mobile crane on outriggers, an operator should ensure: - Answer there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Answer Keeping 90 degree angle between cylinder ro...
Where is the best location for leveling a crane? - Answer Upperworks 
 
When determining the "gross load" the best method is: - Answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Answer Basket, vertical, choker 
 
What is the...
Preview 2 out of 6 pages
Add to cartWhere is the best location for leveling a crane? - Answer Upperworks 
 
When determining the "gross load" the best method is: - Answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Answer Basket, vertical, choker 
 
What is the...
Where is the best location for leveling a crane? - Answer Upperworks 
 
When determining the Agross load@ the best method is: - Answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Answer Basket, vertical, choker 
 
1. What is th...
Preview 2 out of 6 pages
Add to cartWhere is the best location for leveling a crane? - Answer Upperworks 
 
When determining the Agross load@ the best method is: - Answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Answer Basket, vertical, choker 
 
1. What is th...
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? - Answer The front 
 
What is the definition of "operating radius?" - Answer The distance from the center of rotation of the crane to the center of gravity of the loa...
Preview 2 out of 6 pages
Add to cartWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? - Answer The front 
 
What is the definition of "operating radius?" - Answer The distance from the center of rotation of the crane to the center of gravity of the loa...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
 
 
2. When hoisting personnel, within what percentage of le...
Preview 3 out of 17 pages
Add to cart1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
 
 
2. When hoisting personnel, within what percentage of le...
Wire rope installed on most cranes - Answer Right Regular Lay 
 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line before it should be removed from service? - Answer 6 
 
Minimum design factor required for a right regular lay, boom or hoist wire rope - An...
Preview 1 out of 4 pages
Add to cartWire rope installed on most cranes - Answer Right Regular Lay 
 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line before it should be removed from service? - Answer 6 
 
Minimum design factor required for a right regular lay, boom or hoist wire rope - An...
When making a multiple crane lift, it is important for the operator to understand that: - Answer The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Answer Increase ...
Preview 2 out of 6 pages
Add to cartWhen making a multiple crane lift, it is important for the operator to understand that: - Answer The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Answer Increase ...
ASME B30.5 - Answer Mobile and Locomotive cranes, all types 
 
ASME B30.3 - Answer Tower Cranes 
 
ASME B30.23 - Answer Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - Answer Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - Answer 2 randomly broken w...
Preview 2 out of 15 pages
Add to cartASME B30.5 - Answer Mobile and Locomotive cranes, all types 
 
ASME B30.3 - Answer Tower Cranes 
 
ASME B30.23 - Answer Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - Answer Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - Answer 2 randomly broken w...
1x sold
ancillary attachment - Answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - Answer a device that prevents two blocking from occurring if crane is used with load hoist mec...
Preview 2 out of 15 pages
Add to cartancillary attachment - Answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - Answer a device that prevents two blocking from occurring if crane is used with load hoist mec...
Timber or steel - Answer These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - Answer On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - Answer Allows the weight of the cra...
Preview 2 out of 12 pages
Add to cartTimber or steel - Answer These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - Answer On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - Answer Allows the weight of the cra...
Which unsafe condition could result when a wedge socket is attached directly to a load hook, using 6x19 IWRC? 
(A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural failure - Answer (A) Spinning of the load 
 
Which if the following will indicates intemal...
Preview 3 out of 17 pages
Add to cartWhich unsafe condition could result when a wedge socket is attached directly to a load hook, using 6x19 IWRC? 
(A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural failure - Answer (A) Spinning of the load 
 
Which if the following will indicates intemal...
The crane is out of level, you release the swing break, the boom swings downhill, your: - Answer Load radius increases 
 
Blocking can be placed under the ends of tracks to: - Answer Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of gro...
Preview 2 out of 7 pages
Add to cartThe crane is out of level, you release the swing break, the boom swings downhill, your: - Answer Load radius increases 
 
Blocking can be placed under the ends of tracks to: - Answer Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of gro...
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
...
Preview 2 out of 7 pages
Add to cartCrane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
...
What is the max included angle for a shackle? - Answer 120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - Answer 80 % 
 
The center of gravity location of a load may _________of the load - Answer Not be located on the actual physica...
Preview 1 out of 3 pages
Add to cartWhat is the max included angle for a shackle? - Answer 120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - Answer 80 % 
 
The center of gravity location of a load may _________of the load - Answer Not be located on the actual physica...
According to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? - Answer 16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? - Answer 17 feet 8 inches 
 
When working around power lines you must: - Answer A...
Preview 2 out of 6 pages
Add to cartAccording to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? - Answer 16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? - Answer 17 feet 8 inches 
 
When working around power lines you must: - Answer A...
5x sold
Overhead cranes with more than one hoisting unit shall have? - Answer Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - Answer Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answer Removes power to entir...
Preview 2 out of 13 pages
Add to cartOverhead cranes with more than one hoisting unit shall have? - Answer Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - Answer Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answer Removes power to entir...
Boom damage - Answer When taking a side strain on a boom what concerns operator the most? 
 
Capacity based on structural competence - Answer On a load chart the values above the bold line mean 
 
Allowable line pulll decreases - Answer The number of layers of rope on the drum increases the 
 ...
Preview 2 out of 6 pages
Add to cartBoom damage - Answer When taking a side strain on a boom what concerns operator the most? 
 
Capacity based on structural competence - Answer On a load chart the values above the bold line mean 
 
Allowable line pulll decreases - Answer The number of layers of rope on the drum increases the 
 ...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.
No, you only buy these notes for $40.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
71184 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now