[Mostrar más]A ladder should extend a minimum of _____ above the top of a trench or excavation. - ANSWER-1' 
 
According to OSHA, shoring lumber shall be ____. - ANSWER-Select structural 
 
cal/OSHA inspectors cannot, under most circumstances: - ANSWER-Enter a business outside of normal business hours. 
 
Every...
Vista previa 2 fuera de 8 páginas
Añadir al carritoA ladder should extend a minimum of _____ above the top of a trench or excavation. - ANSWER-1' 
 
According to OSHA, shoring lumber shall be ____. - ANSWER-Select structural 
 
cal/OSHA inspectors cannot, under most circumstances: - ANSWER-Enter a business outside of normal business hours. 
 
Every...
PTICH - ANSWER-rise/span 
 
what size of a circuit breaker can be installed on a line with 7 outlets 14 AWG wire? - ANSWER-15 amp; according to code, the conductor ampacity rating for a 14 gauge wire is 15 amps. for 12 gauges wire is 20 amps. the number of outlets does not determine the size of circ...
Vista previa 2 fuera de 13 páginas
Añadir al carritoPTICH - ANSWER-rise/span 
 
what size of a circuit breaker can be installed on a line with 7 outlets 14 AWG wire? - ANSWER-15 amp; according to code, the conductor ampacity rating for a 14 gauge wire is 15 amps. for 12 gauges wire is 20 amps. the number of outlets does not determine the size of circ...
A subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. - ANSWER-30 
 
How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? - ANSWER-By certified mail 
 
By overnight mail 
 
By persona...
Vista previa 3 fuera de 19 páginas
Añadir al carritoA subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. - ANSWER-30 
 
How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? - ANSWER-By certified mail 
 
By overnight mail 
 
By persona...
1. It is better to use a leveling rod than a yard stick when using a transit because the rod is: 
 
A. Straighter 
B. Longer 
C. Easier to read 
D. Graduated to 64 h - ANSWER-longer 
 
1. Fill dirt is measured in: 
 
A. Cubic yards 
B. Square yards 
C. Cubic feet 
D. Square feet - ANSWER-cubic yards...
Vista previa 3 fuera de 17 páginas
Añadir al carrito1. It is better to use a leveling rod than a yard stick when using a transit because the rod is: 
 
A. Straighter 
B. Longer 
C. Easier to read 
D. Graduated to 64 h - ANSWER-longer 
 
1. Fill dirt is measured in: 
 
A. Cubic yards 
B. Square yards 
C. Cubic feet 
D. Square feet - ANSWER-cubic yards...
To whom should a stop notice be delivered? - ANSWER-The construction lender or awarding authority. 
 
What are the 3 ways that a stop notice can be delivered? - ANSWER-(1) In person 
(2) Registered mail 
(3) Certified mail 
 
Notice of Completion - ANSWER-A notice that shortens the lien period to 30...
Vista previa 2 fuera de 10 páginas
Añadir al carritoTo whom should a stop notice be delivered? - ANSWER-The construction lender or awarding authority. 
 
What are the 3 ways that a stop notice can be delivered? - ANSWER-(1) In person 
(2) Registered mail 
(3) Certified mail 
 
Notice of Completion - ANSWER-A notice that shortens the lien period to 30...
28. The advantage of wood frames over metal frames for windows is: 
 
A. Metal does not provide good insulation 
B. They can be hermetically sealed 
C. Wood frames cost less 
D. There's no problem with expansion - ANSWER-Metal does not provide good insulation 
 
28. Window sizes are "designated as...
Vista previa 3 fuera de 16 páginas
Añadir al carrito28. The advantage of wood frames over metal frames for windows is: 
 
A. Metal does not provide good insulation 
B. They can be hermetically sealed 
C. Wood frames cost less 
D. There's no problem with expansion - ANSWER-Metal does not provide good insulation 
 
28. Window sizes are "designated as...
Lightweight concrete is BEST used at the: 
A. curb & gutter 
B. second floor decking 
C. first floor slab on grade 
D. footings - ANSWER-B. 
Second floor decking. 
It is costly, but very strong. It offers greatest advantage when used for upper stories because it reduces the strength requirements for...
Vista previa 4 fuera de 107 páginas
Añadir al carritoLightweight concrete is BEST used at the: 
A. curb & gutter 
B. second floor decking 
C. first floor slab on grade 
D. footings - ANSWER-B. 
Second floor decking. 
It is costly, but very strong. It offers greatest advantage when used for upper stories because it reduces the strength requirements for...
acid waste piping - ANSWER-System piping and fittings that are resistant to acid contents usually found in manufacturing 
processes. 
 
aerator - ANSWER-A device used to mix air and water with water distribution and water conservation in mind; e.g., faucets. 
 
air gap (drainage system) - ANSWER-The...
Vista previa 2 fuera de 6 páginas
Añadir al carritoacid waste piping - ANSWER-System piping and fittings that are resistant to acid contents usually found in manufacturing 
processes. 
 
aerator - ANSWER-A device used to mix air and water with water distribution and water conservation in mind; e.g., faucets. 
 
air gap (drainage system) - ANSWER-The...
The lifting lines should be as vertical as possible - ANSWER-When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? 
 
A. One lifting line should be horizontal 
B. The lifting lines should be ...
Vista previa 3 fuera de 20 páginas
Añadir al carritoThe lifting lines should be as vertical as possible - ANSWER-When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? 
 
A. One lifting line should be horizontal 
B. The lifting lines should be ...
Electrical Circuit - ANSWER-An _________ ________ consists of a power source, conductors, and load 
 
simple curcuit - ANSWER-A ________ ________ consists of only one energy source, one conductor, and one load. 
 
series curcuit - ANSWER-A simple ________ ________ has at least two loads. The current...
Vista previa 2 fuera de 11 páginas
Añadir al carritoElectrical Circuit - ANSWER-An _________ ________ consists of a power source, conductors, and load 
 
simple curcuit - ANSWER-A ________ ________ consists of only one energy source, one conductor, and one load. 
 
series curcuit - ANSWER-A simple ________ ________ has at least two loads. The current...
What does it mean when the underground service alert marks the grounds with WHITE stakes and markings? - ANSWER-Proposed Excavation 
 
What is the length a ladder must extend above the excavation/trench? - ANSWER-3 feet 
 
When should an employee wear foot and/or leg protection? - ANSWER-ALL 
 
-Whe...
Vista previa 3 fuera de 16 páginas
Añadir al carritoWhat does it mean when the underground service alert marks the grounds with WHITE stakes and markings? - ANSWER-Proposed Excavation 
 
What is the length a ladder must extend above the excavation/trench? - ANSWER-3 feet 
 
When should an employee wear foot and/or leg protection? - ANSWER-ALL 
 
-Whe...
cancel home solicitation contract within... - ANSWER-3 Bus. day 
 
Return a home solicitation down payment after cancelation within - ANSWER-10 day 
 
After progress payment received, prime to pay sub within - ANSWER-7 days 
 
Appeal a citation from the registrar within - ANSWER-15 Bus. day 
 
Begin...
Vista previa 2 fuera de 5 páginas
Añadir al carritocancel home solicitation contract within... - ANSWER-3 Bus. day 
 
Return a home solicitation down payment after cancelation within - ANSWER-10 day 
 
After progress payment received, prime to pay sub within - ANSWER-7 days 
 
Appeal a citation from the registrar within - ANSWER-15 Bus. day 
 
Begin...
CSLB Stands For ? - ANSWER-Contractors 
State 
License 
Board 
 
CSLB Established Year Date? - ANSWER-1929 
 
CSLB Rules And Regulations Enforced By? - ANSWER-CSLB Registrar & SWIFT 
 
Notify The CSLB Registrar Workers Compensation Exempt Or Workers Compensation Insurance Policy Number Within How...
Vista previa 1 fuera de 2 páginas
Añadir al carritoCSLB Stands For ? - ANSWER-Contractors 
State 
License 
Board 
 
CSLB Established Year Date? - ANSWER-1929 
 
CSLB Rules And Regulations Enforced By? - ANSWER-CSLB Registrar & SWIFT 
 
Notify The CSLB Registrar Workers Compensation Exempt Or Workers Compensation Insurance Policy Number Within How...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller IMORA. Stuvia facilitates payment to the seller.
No, you only buy this summary for $22.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now