Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided b...
Preview 3 out of 25 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
 
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided b...
API 510 Questions and Answers 100% Pass 
 
 
Temp range CUI on SS material 
150-400 
Fitness for service code 
API 579 
RBI code 
API 580 
API design for fabrication of exchangers 
API 660 
In service welding code 
API 2201 
Alternate evaluation for pits and LTAs 
Section 8 div 2 
Welder and weld p...
Preview 2 out of 10 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
Temp range CUI on SS material 
150-400 
Fitness for service code 
API 579 
RBI code 
API 580 
API design for fabrication of exchangers 
API 660 
In service welding code 
API 2201 
Alternate evaluation for pits and LTAs 
Section 8 div 2 
Welder and weld p...
API 510 Questions and Answers 100% Pass 
 
 
NDE examinations must be scheduled at intervals that consider the 
Probability of the NDE method to identify the damage 
What is the transition temperature of a metal? 
The temp at which the material fracture code changes from ductile to brittle 
A prima...
Preview 2 out of 8 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
NDE examinations must be scheduled at intervals that consider the 
Probability of the NDE method to identify the damage 
What is the transition temperature of a metal? 
The temp at which the material fracture code changes from ductile to brittle 
A prima...
API 510 Questions and Answers 100% Pass 
 
Damage Mechanisms Affecting Fixed Equipment in the Refining Industry 
API 571 
Inspection Practices for Pressure Vessels 
API 572 
Inspection of Pressure Relieving Devices 
API 576 
Welding Processes, Inspection, and Metallurgy 
Api 577 
Section IX 
Qualif...
Preview 1 out of 1 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
Damage Mechanisms Affecting Fixed Equipment in the Refining Industry 
API 571 
Inspection Practices for Pressure Vessels 
API 572 
Inspection of Pressure Relieving Devices 
API 576 
Welding Processes, Inspection, and Metallurgy 
Api 577 
Section IX 
Qualif...
API 510 Questions and Answers 100% Pass 
 
 
Overall responsibility for complying with API 510 
Owner 
During Repairs and Alterations - responsible for quality control 
Repair organization 
Assure owner - testing, inspection, and examination activities meet Code 
Inspector 
Evaluate and accept NDE ...
Preview 2 out of 5 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
Overall responsibility for complying with API 510 
Owner 
During Repairs and Alterations - responsible for quality control 
Repair organization 
Assure owner - testing, inspection, and examination activities meet Code 
Inspector 
Evaluate and accept NDE ...
API 510 Questions and Answers 100% Pass 
 
 
Items that may affect pressure vessel integrity may include: 
a. Noises, vibrations, leaks, movements 
b. Insulation damage, external vessel deterioration 
c. Support structure deterioration 
d. Significant bolting corrosion 
e. All of the above 
f. None...
Preview 4 out of 52 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
Items that may affect pressure vessel integrity may include: 
a. Noises, vibrations, leaks, movements 
b. Insulation damage, external vessel deterioration 
c. Support structure deterioration 
d. Significant bolting corrosion 
e. All of the above 
f. None...
API 510 Questions and Answers 100% Pass 
 
___________vessels—a vessel fabricated to a recognized construction code but has lost its nameplate or stamping. 
nonstandard vessels 
1.1.2 Intent 
The intent of this code is to specify the in-service inspection and condition-monitoring program that is ...
Preview 2 out of 13 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
___________vessels—a vessel fabricated to a recognized construction code but has lost its nameplate or stamping. 
nonstandard vessels 
1.1.2 Intent 
The intent of this code is to specify the in-service inspection and condition-monitoring program that is ...
API 510 Questions and Answers 100% Pass 
 
 
NDE-MINIMUM TIME AN EXAMINER SHOULD BE IN A DARKENED AREA PRIOR TO USING BLACK LIGHT FOR MT & PT EXAMS 
5 minutes 
NDE-FINAL INTERPRETATION OF A PT EXAM AFTER APPLICATION OF DEVELOPER 
10-60 minutes 
TESTING-TYPICAL MINIMUM DURATION FOR A PRESSURE TEST 
...
Preview 1 out of 2 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
NDE-MINIMUM TIME AN EXAMINER SHOULD BE IN A DARKENED AREA PRIOR TO USING BLACK LIGHT FOR MT & PT EXAMS 
5 minutes 
NDE-FINAL INTERPRETATION OF A PT EXAM AFTER APPLICATION OF DEVELOPER 
10-60 minutes 
TESTING-TYPICAL MINIMUM DURATION FOR A PRESSURE TEST 
...
API 510 Questions and Answers 100% Pass 
 
 
Vessels that have a remaining life over 10 years or protected against external corrosion shall: 
be observed at least every 5 years 
Period between internal or on-stream inspection not to exceed 
the lesser of 1/2 remaining corrosion life or 10 years 
LT...
Preview 1 out of 2 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
Vessels that have a remaining life over 10 years or protected against external corrosion shall: 
be observed at least every 5 years 
Period between internal or on-stream inspection not to exceed 
the lesser of 1/2 remaining corrosion life or 10 years 
LT...
API 510 Questions and Answers 100% Pass 
 
 
1. API 510 is an in service inspection code that covers the in service_______ activities for pressure vessels and pressure relieving devices protecting the vessels 
Inspection, repair, alteration, rerating 
1. According to API 510, what is a non standard...
Preview 2 out of 12 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
1. API 510 is an in service inspection code that covers the in service_______ activities for pressure vessels and pressure relieving devices protecting the vessels 
Inspection, repair, alteration, rerating 
1. According to API 510, what is a non standard...
API 510 Questions and Answers 100% Pass 
 
 
API 577 requires how many welds to be radiographed? 
None 
CUI Temperature affecting Stainless Steel 
150 to 400 degrees 
Weld process most widely used 
SMAW 
Arc between electrode and weld pool. Heat from arc comes from consumable covered electrode 
SMA...
Preview 2 out of 8 pages
Add to cartAPI 510 Questions and Answers 100% Pass 
 
 
API 577 requires how many welds to be radiographed? 
None 
CUI Temperature affecting Stainless Steel 
150 to 400 degrees 
Weld process most widely used 
SMAW 
Arc between electrode and weld pool. Heat from arc comes from consumable covered electrode 
SMA...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller SUPERGRADES01. Stuvia facilitates payment to the seller.
No, you only buy these notes for $35.53. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
75323 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now