IAHCSMM CER Progress Test (Mix of all 4)
Specific tasks to be done, time horizons for these tasks, and resource allocation are all part of an effective: A. Preventive maintenance program B. Leak testing policy C. Action Plan D. All the above - Answer- D Quality management measures for endoscopes include repair cost per procedure for each endoscope. A. True B. False - Answer- A When receiving a loaned endoscope that is made by a different manufacturer than what the facility uses, competencies do not need to be done, as long as the endoscope is the same type as the one the facility sent out for repair. A. True B. False - Answer- B Surveyors may ask staff in the endoscope reprocessing area to demonstrate departmental protocols for damaged endoscopes. A. True B. False - Answer- B It is important for all staff who process endoscopes to understand the point of use preparation and handling of endoscopes. A. True B. False - Answer- A Operative (therapeutic) flexible endoscopes are used to identify possible disease. A. True B. False - Answer- B This endoscope has a movable elevator mechanism that has been linked to infection. A. Colonoscope B. Enteroscope C. Duodenoscope D. Choledoscope - Answer- C The insertion tube of a flexible endoscope: A. Protects the inner components of the endoscope B. Houses the air, water, and instrument channels C. Is part of the endoscope that is inserted into the patient D. All the above - Answer- D
Written for
- Institution
- IAHCSMM CER
- Course
- IAHCSMM CER
Document information
- Uploaded on
- March 9, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- specific tasks to be done
-
iahcsmm cer progress test mix of all 4
-
time horizons for these tasks
-
and resource allocation are all part of an effective
-
quality management measures for endoscopes incl