100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

FDOT Earthwork Level 1 Exam Questions With 100% Correct Answers.

Beoordeling
-
Verkocht
4
Pagina's
8
Cijfer
A+
Geüpload op
17-11-2023
Geschreven in
2023/2024

Basics covered in Level 1 -Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? -Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - 6" of compacted depth at full width In Earthwork what is a Lot? - A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - Done for base, sub grade, and embankment. Sampling is determined how - generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - Minimum of three representative sample combined. What is LIMS? - Laboratory Info Management System The proctor theory is when compaction is achieved how - by inputting energy to expel air and water in the soil voids Compaction causes - An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and creates what - In a laboratory and establishes a density standard to be used on the roadwayLab proctors are created how - Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - It is used in embankment and structure back fill materials Standard proctors are created how - With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total

Meer zien Lees minder
Instelling
FDOT Earthwork Level 1
Vak
FDOT Earthwork Level 1









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
FDOT Earthwork Level 1
Vak
FDOT Earthwork Level 1

Documentinformatie

Geüpload op
17 november 2023
Aantal pagina's
8
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Voorbeeld van de inhoud

FDOT Earthwork Level 1 Basics covered in Level 1 - ✔✔ Nuclear Testing Speedy Moisture Report Forms Earthwork ha s to do with the roadway in what way? - ✔✔ Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - ✔✔ 6" of compacted depth at full width In Earthwork what is a Lot? - ✔✔ A lot is 1 li ft at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - ✔✔ Done for base, sub grade, and embankment. Sampling is determined how - ✔✔ generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - ✔✔ Minimum of three representative sample combined. What is LIMS? - ✔✔ Laboratory Info Management System The proctor theory is when compaction is achieved how - ✔✔ by inputting energy to expel air and water in the soil voids Compaction causes - ✔✔ An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and create s what - ✔✔ In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how - ✔✔ Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - ✔✔ It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - ✔✔ With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - ✔✔ It is u sed in embankment and structure back fill materials Standard proctors are created how - ✔✔ With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance - ✔✔ 2 lbs/pcf What is the STRG - ✔✔ Sampling, Testing, and Reporting Guide (state wide) A job guide schedule is - ✔✔ project specific The material identification number for embankment in the laboratory is - ✔✔ 004L The material identification number for embankment in the field is - ✔✔ 004F The material identification number for base is - ✔✔ 030 PP is short for - ✔✔ project personel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1825
Lid sinds
2 jaar
Aantal volgers
1043
Documenten
22338
Laatst verkocht
4 dagen geleden

3.8

317 beoordelingen

5
147
4
60
3
54
2
16
1
40

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen