Sprinkler Chart Questions (S12) with correct Answers
Sprinkler Chart Questions (S12) with correct Answers How often shall the stem of an OS&Y Valve be lubricated - Answer ️️ -Annually The 3 year dry pipe trip test is to be performed by whom? - Answer ️️ -MP & MFSPC Fire department connections are to be inspected how often? - Answer ️️ -Quarterly Water motor gongs are to be tested how often? - Answer ️️ -Quarterly In a water spray fixed system inspection if the strainer is found corroded what color tag is required? - Answer ️️ -Yellow A sprinkler head with a red frame has a temperature classification of? - Answer ️️ -Extra High (325 - 375°F) The Hydraulic name plate shall be inspected how often? - Answer ️️ -Quarterly What color tag is required when sprinkler heads are found to be lightly corroded? - Answer ️️ - Orange Obstructions in sprinkler systems shall be investigated how often? - Answer ️️ -5 Years What color tag is required when the circuit breakers on a special service pump are over 2 years old? - Answer ️️ -Orange What color tag is required when sprinkler heads made prior to 1920 have not been replaced? - Answer ️️ -Orange, notify FDNY after 30 days During an operational test of a foam water sprinkler system, if the nozzles are plugged what color tag is used? - Answer ️️ -Red Steel water storage tanks without corrosive protection are to be inspected how often? - Answer ️️ -3 years A sprinkler head with a white frame has a temperature rating of? - Answer ️️ -175 - 225°F The weekly test of an electric fire pump is how long? - Answer ️️ -10 minutes The weekly test of a Diesel fire pump is how long? - Answer ️️ -30 minutes
Written for
- Institution
- S-12 Sprinkler
- Course
- S-12 Sprinkler
Document information
- Uploaded on
- January 19, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
sprinkler chart questions s12 with correct answe
Document also available in package deal