NERC 34 EXAM QUESTIONS AND ANSWERS
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - ️️b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area A b) A net under-generation in the Interconnection c) A loss of load in Balancing Area A d) A loss of load in the Interconnection - ️️b) A net under-generation in the Interconnection What is the penalty for a Balancing Authority violating the Disturbance Control Standard? a) Must carry additional Contingency Reserve b) Must develop a correction action plan c) Must re-evaluate and change its Frequency Bias Setting d) Must increase its Regulating Reserve - ️️a) Must carry additional Contingency Reserve
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 23, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal