100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Concrete Batch Plant Operator Exam (FDOT) Questions and Answers 2024 $11.49   Add to cart

Exam (elaborations)

Concrete Batch Plant Operator Exam (FDOT) Questions and Answers 2024

 10 views  0 purchase
  • Course
  • Concrete Batch Plant Operator
  • Institution
  • Concrete Batch Plant Operator

Concrete Batch Plant Operator Exam (FDOT) Questions and Answers 2024 Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - Answer-Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? -Answ...

[Show more]

Preview 2 out of 5  pages

  • February 12, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • Concrete Batch Plant Operator
  • Concrete Batch Plant Operator
avatar-seller
KatelynWhitman
Concrete Batch Plant Operator Exam (FDOT)
Questions and Answers 2024


Stockpiles of aggregate shall be maintained in a well-drained condition in order to: -

Answer-Minimize Free Water Content

Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch

for FDOT? -Answer-24

Free moisture of the aggregate means: -Answer-Moister on the surface of an aggregate

that is above and beyond the absorbed moister in the aggregate.

If the moister test is done other than by the cook-out method, how often shall the other

methods be verified? -Answer-Each week

For drill shaft concrete, the quantity of cement replaced with fly ash shall be: -Answer-

33 thru 37%

In concrete, which material has a specific gravity of one? -Answer-Water

What is the air content range for all classes of structural concrete except Class IV

Shaft? -Answer-1.00 thru 6.00%

When can unmetered water be added to the concrete? -Answer-Not at all.

Do not allow the total number of revolution at mixing speed to exceed: -Answer-160

Revolutions

, After all materials have been charged into the transit mixer drum, the concrete must be

mixed at how many revolutions at the plant before leaving for the project? -Answer-70 to

100

When the water meters / scales are calibrated, prior to production, at what frequency

should they be checked there after? -Answer-3 moths

To what accuracy should the scales for weighing cement , pozzolan, slag and

aggregates at the plant be maintained -Answer-0.5% of maximum load normally

handled

For concrete containing a water-reducing retarding admixture, in an agitator truck, the

maximum time for depositing the concrete shall not exceed: -Answer-90 minutes

If a load of concrete has been rejected due to excessive slump, the concrete may

remain in the transporting vehicle to reduce the slump. -Answer-Is not allowed.

Who places the orders for concrete with the producer? -Answer-The contractor

The minimum normal sampling frequency for the chloride content of structural concrete

is: -Answer-1 per design mix in use from the first day of production and every 30

calendar days or less thereafter.

In what moister condition are the aggregates on the approved concrete mix designs? -

Answer-SSD condition

The specific gravity of an aggregate is the ratio of its unit weight to the weight of an

equal absolute volume of: -Answer-Water

What is the weight of a bag of Portland cement in the USA? -Answer-94 lbs

What is the maximum concrete temperature allowed when using a hot weather design

mix? -Answer-100 degrees F

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller KatelynWhitman. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart