SWM DEQ Exam Questions & Answers (2024/2025) [100% Verified Answers A+].
SWM DEQ Exam Questions & Answers (2024/2025) [100% Verified Answers A+]. The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - Answer -Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - Answer -greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - Answer - permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request - Answer -90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - Answer -staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders The dual certificate will expire three years from - Answer -the latest date of the certificates SWM plan must be approved by ___ before land disturbance - Answer -VSMP program authority The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - Answer -0.41 lbs/acre/year The phosphorus load limit uses the - Answer -10% impervious cover Part II B and II C water quantity criteria addresses - Answer -channel protection and flood protection.
Written for
- Institution
- SWM DEQ
- Course
- SWM DEQ
Document information
- Uploaded on
- March 12, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
swm deq exam questions answers
-
swm deq exam questions answers 100 verified
-
swm deq questions answers 100 verified
-
swm deq questions answers a