ABYC test Review Exam Questions With Solved Answers
17 views 0 purchase
Course
ABYC
Institution
ABYC
Project H - ANSWER -Hull Division, Boat load capacity, buoyancy in swamping, bilge pump systems, installation of potable water systems for use on boats, cockpit drainage systems, field of vision from the helm position, Gasoline and Diesel Fuel Systems
Project P - ANSWER -Machinery Divison, Insta...
ABYC test Review Exam Questions With Solved Answers
Project A - ANSWER -Equipment Division, includes: LPG, propane, etc. systems, galley
stoves, fire fighting equip. AC and refrigeration, heating systems, navigation lights, sound signal appliances, CO detectors, Galvanic isolators, AC Generator sets, Battery chargers and Inverters, Emergency engine/propulsion cut-off devices
Project E - ANSWER -Electrical Divison, Cathodic protection, AC/DC systems on boats,
storage batteries
Project H - ANSWER -Hull Division, Boat load capacity, buoyancy in swamping, bilge pump systems, installation of potable water systems for use on boats, cockpit drainage systems, field of vision from the helm position, Gasoline and Diesel Fuel Systems
Project P - ANSWER -Machinery Divison, Installation of exhaust systems, inboard engines, propeller shafting systems, steering systems, propulsion control systems, steering wheels, hydraulic steering, electric steering/propulsion control systems
Project S - ANSWER -Industry Conformity Standards, boat capacity labels, boat measurement and weight, outboard engine, transom and engine well dimensions, outboard engine and related equipment weights
A-1 Marine Liquefied Petroleum Gas (LPG) systems - ANSWER -1.5.1 - General Requirements: Printed instructions and a labeled diagram(s) covering details of proper installation, maintenance and operation shall be provided w/ each LPG system on boat. The instructions shall state that a test be made every time the cylinder supply valve is opened for use and after any events that may have affected the system such as grounding, fire, or collision. See A-1.10.3.1 and A-1.11.
A-1 Marine Liquefied Petroleum Gas (LPG) systems - ANSWER -1.5.2 Each systems shall be fitted with a pressure gauge. the gauge shall read the cylinder pressure side of the pressure regulator.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller IMORA. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.19. You're not tied to anything after your purchase.