Designated Representative OSSF Questions with 100 % correct answers |Verified
30 TAC Chapter 285 - This chapter establishes minimum standards for planning materials, construction, installation, alteration, repair, extension, operation, maintenance, permitting, and inspection of OSSFs. This chapter also provides the procedures for the designation of local governmental entities as authorized agents. 30 TAC Chapter 30 - The licensing of installers, designated representatives, and site evaluators and the registration of apprentices is included in this chapter. Title 5, Chapter 366 Texas Health and Safety Code - The Texas statute establishing OSSF regulations and regulators. September 1989 - The year in which statewide regulation of OSSFs began OSSF minimum requirements - 1) produce no more than 5,000 g of waste daily 2) waste must originate and be disposed of on site 3) wastewater must be disposed in soil or as vapor 1990 - The requirement for installers to be licensed went into effect 1998 - The requirement for Installer II and DR to be licensed went into effect 2002 - The requirement for SE to be licensed went into effect 2009 - The requirement for MP to be licensed went into effect Installer II extra requirements - - one year as Installer I and 3 installations w/notarized statements - or two years as apprentice with six installations w/notarized statements SE extra requirements - must have previous license of one: Installer IIDR PE RS Professional Geoscientist MP extra requirements - Installer II, Class C Wastewater License, or documented experience of 3 years as maintenance technician Maintenance Technician and Apprentice note - Only license that doesn't require exam, Apprentice does not require class either 3 years, 24 hours - OSSF licenses are issued for a term of ____ years and require ____ hours for renewal Daily - How often must an installer check an apprentice's work? Ten Acre Rule - An OSSF for a single-family residence on a 10 acre lot or more with disposal lines at least 100ft from property line are not required to apply for a permit for a new construction. Permit Processing Steps - 1) Site Evaluation w/ written report 2) Selection of OSSF based on Site Evaluation 3) System planned 4) Permit application and planning materials submitted 5) Application reviewed and approved or denied within 30 days 6) Authorization to Construct ATC issued and valid for 1 year 7) Construction 8) Inspection covering all parts of system. If failed, 7 days to send letter of deficiencies 9) License to Operate LTO issued OSSF permit application should include: - - Site Evaluation - Legal description of property - Affidavits as required- Maintenance contract - Design Calculations - Equipment/Material Specifications - Scale drawing showing all features effecting operation of disposal system - Criminal Penalties - Injunction or civil suit - Administrative Penalties - Legal Penalties for violating OSSF rules Criminal Penalties - Initiated in court through district or county attorney by either authorized agent or TCEQ. Often misdemeanors. Injunction or Civil Suit - Can only be initiated by TCEQ through Attorney General. Local government may request TCEQ to initiate enforcement or pursue civil action. TCEQ may choose not to. Administrative Penalites - May be assessed by TCEQ against a person in violation of the rules, regulations, or OSSF permit. May request enforcement from Attorney General. Installers can plan - Standard, conventional, gravel-filled standard drainfields, lined and unlined ET beds, gravelless pipe, leaching chambers Requires a Professional Designer - Surface application, low-pressure dosing, mounds, non standard systems. All systems in Edwards Aquifer recharge zone. Al multi-unit developments. All systems in floodways. All systems with variance. Small lots with less than 1/2 acre on public water or 1 acre without public water. Multiple systems on large tract
Written for
- Institution
- Designated Representative OSSF
- Course
- Designated Representative OSSF
Document information
- Uploaded on
- April 1, 2024
- Number of pages
- 20
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
designated representative ossf