Exam (elaborations)
CSCS Study Guide- Comprehensive Questions with Answers
- Course
- Institution
New Facility Design Predesign (25%/6 mo)- needs analysis, feasibility study Design (10-12%/3 mo)- architect, equipment specifications, spacing, access Construction (50%/12 mo)- deadlines set Preoperation (15%/3-4 mo)- staffing Existing Facility Strength and Conditioning Professional improve a...
[Show more]