CSI CDT Exam Questions 2024 Marking Scheme 100% Verified
CSI CDT Exam Questions 2024 Marking Scheme 100% Verified In a Design/Build project, there is a contractual relationship established between: - Answer -The Owner and single party, Typically a Contractor associated with an A/EnnnFF 040 For the Public sector, Which method is normally followed for the award of a contract? - Answer -Competitive Bidding nnFF 040 The Construction Manager is normally hired by? - Answer -The Owner nnFF 040 The form of contract usually most difficult to administer during construction is: - Answer -Multiple Prime Contracts In the Single-Prime contract situation the Owner does not have a contractual relationship with which of the following - Answer -Sub-contractor In which phase are the specifications produced? - Answer -Design Phase - Construction DocumentsnnFF 010 Whose responsibility is it to produce the shop drawings? - Answer -The ContractornnFF 010 Which organizational system is used in the preliminary stages of a project? - Answer -UniFormat Who developed the first formal UniFormat? - Answer -The AIA and The CSI Whose responsibility is the maintenance of the revised UniFormat? - Answer -The CSC and The CSI When is the CSI/CSC UniFormat used? - Answer -In the planning stage of a project When is the MasterFormat used? - Answer -When organization of detailed construction is required on the basis of materials or methods How many Divisions are found within the MasterFormat System? - Answer -16 What would be an example of data filing with the MasterFormat System? - Answer -Product literature,nSweets Catalog,nSpecData What information is found within Division 13 in the MasterFormat System? - Answer -Special Construction What are the three parts of the SectionFormat? - Answer -General, Products and Execution In what part of the SectionFormat is found information on submittals? - Answer -Part 1, General The third part of the Three-Part Section Format is: - Answer -Execution MasterFormat is organized in such a way that a specification section could be written at: - Answer -One of four levels of complexity 13. Under PART 3, EXECUTION, all of these statements apply EXCEPT:nnA. Include paragraphs requiring the Contractor to verify surfaces free of defects that would result in poor applicationsnB. Include statements concerning preparation as preliminary action necessary for accomplishment of the WorknC. Include actions that actually accomplish the WorknD. Include test of products prior to installation - Answer -D. Include test of products prior to installation MasterFormat is based on: - Answer -A five-digit numbering system All of the following should be included in Project/Site Conditions EXCEPT:nnA. Existing conditions that affect the application of other materialsnB. Protection of materials delivered to the sitenC. Limitations such as temperature or weather that affect proper installationnD. References to documents about existing structures or utilities - Answer -B. Protection of materials delivered to the site All of the following are articles in PART 1, GENERAL EXCEPT:nnA. ReferencesnB. SubmittalsnC. Source Quality ControlnD. Sequencing and Scheduling - Answer -C. Source Quality Control Division numbers are fixed, but specification section numbers and titles: - Answer -Are fixed for level two and three sections but can be individually selected for level four sections An example of a level four section is: - Answer -05215 Open Web Steel Joists Section 06220 Millwork would be considered a: - Answer -Level three section The document recommended to organize preliminary construction information into a standard order on the basis of elements or systems is: - Answer -UniFormat
Schule, Studium & Fach
- Hochschule
- CSI CDT
- Kurs
- CSI CDT
Dokument Information
- Hochgeladen auf
- 28. juni 2024
- Anzahl der Seiten
- 12
- geschrieben in
- 2023/2024
- Typ
- Prüfung
- Enthält
- Fragen & Antworten
Themen
- csi cdt
- csi cdt exam
- csi cdt exam questions
-
csi cdt exam questions 2024 marking scheme