DBIA Test Study Questions and Answers
with Complete Solutions Updated 2024
possiblea
possiblea 8/7/24 DBIA
, How team members are organized, reasonably inferable from gmp design
establishes when parties engage, documents - construction manager at
determines roles of parties, and risk
determines sequence of design,
procurement, and construction (db,
cmar, dbb) - Project Delivery System The owner contracts with one entity
(a person or firm) to provide both
design and construction services,
how team members are selected designer and contractor have a direct
(QBS, best value, low price, sole contractual relationship, selected by
source) - Procurement Method QBS or best value, wide spectrum of
contracting approaches and
organizational structures, single point
how team members are paid (fp, gmp, responsibility, owner does not manage
cost reimbursement, target price, unit designer, owner exposure to claims is
price) - contracting approach significantly reduced - Design-Build
linear, sequential process, A/E similar to design build, in industrial
selected on qualifications, GC and power generation sectors, systems
selected on low price, design is fully and performance testing are central to
completed without input from GC, scope, contractor will typically
A/E acting in owner's interests, with a perform engineering with its in-house
historically strong bond, process is staff, owner has need for single point
well-established and understood - responsibility, contracts include plant
Design-Bid-Build (DBB) and process performance guarantees,
contract items include performance
and schedule liquidated damages and
similar org structure to DBB, limitations of liability - engineer
construction manager selected by procure construct (epc)
QBS or best value, contractor
provides precon services, negotiated
gmp contracting approach, open book owner contracts with multiple trade
estimating process, potential to fast contractors, attributes are typically
track project, construction cost similar to dbb, owner's ability to
determined before design completed, schedule and coordinate the work -
potential issues over what is Multiple Prime Contracting