100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Fire Pump Study Guide Questions with Correct Answers. $14.99   Add to cart

Exam (elaborations)

Fire Pump Study Guide Questions with Correct Answers.

 9 views  0 purchase
  • Course
  • Cal Fire
  • Institution
  • Cal Fire

Fire Pump Study Guide Questions with Correct Answers.

Preview 2 out of 6  pages

  • August 17, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Cal Fire
  • Cal Fire
avatar-seller
cracker
Fire Pump Study Guide Questions with Correct
Answers
Heat exchangers shall be checked for _______ water flow Correct
Answer-Cooling


All alarm pilot lights should be in what state? Correct Answer-Off


There are two requirements listed under pump house conditions, choose
both listed below Correct Answer-Ventilating louvers are free to
operate,
Heat is adequate, not less than 40F for diesel pump rooms


Weekly inspection requires verification that the pump suction discharge
and bypass valves should be fully open? Correct Answer-True


When verifying the electrical system conditions, the controller pilot light
should be? Correct Answer-Illuminated


Diesel engine fuel tank level, float switch and solenoid valve operation
shall be checked Correct Answer-Weekly


What fire pump type do you record the time to crank? Correct Answer-
Diesel

, The pertinent visual observation categories required to be inspected
weekly checklists are? Correct Answer-Pump house conditions, Pump
system conditions, electrical system conditions, diesel engine system
conditions, steam system conditions


The purpose of inspecting the pump assembly? Correct Answer-Appears
to be in operating condition and is free from physical damage


The transfer switch normal pilot light should be illuminated Correct
Answer-True


The isolating switch for electric pumps should be closed. Correct
Answer-True


Pump packing boxes, bearings and casing shall be checked for Correct
Answer-Overheating


The reverse phase alarm pilot light for electric pumps should be off
Correct Answer-True


The purpose of testing the pump assembly is to ensure automatic and
manual operation upon demand and continuous delivery of the required
system output. An additional purpose is to detect Correct Answer-
Deficiencies not evident by inspection


The normal phase rotation pilot light should be on Correct Answer-True

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67474 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart