____ ______ are used when the load from columns or walls is very high. They combine
all loads into one mat thereby eliminating differential settlement between individual
footings. Many of the high-rise buildings in downtown Houston are supported by these
foundations. - ANSWER-Mat Foundations

_____ _____ or Caissons are a cast in place foundations which distribute loads through
skin friction and/or bearing. - ANSWER-Drilled Shafts

_____ ______ are used to spread the load of columns or walls over an area large
enough to reduce the load per square foot below the bearing capacity of the soil. This
type of system may be used when the bearing layer of soil is within 10' of the surface.
This is known as a shallow foundation system. - ANSWER-Spread Footings

_____ foundations transfer heavy loads to underlying strata that is too deep to utilize
spread footings or mat foundations. - ANSWER-Pile

_____ stabilization can be used beneath roadways to chemically change the clay soil so
it's less reactive with water. - ANSWER-Lime

______ Damages are daily fees used to punish a GC for every day they run over the
project completion date. - ANSWER-Liquidated

______ structures are supported by a non-expansive layer of earth, like bedrock. -
ANSWER-Isolated

_____-set concrete is a type that hardens quickly but is relatively very weak. -
ANSWER-Flash

(T/F) Multi Prime contracts, where the owner has a separate contract with each party, is
common with fast tracking. - ANSWER-True

1 CY = ___ CF - ANSWER-27 CF

1 mile = _____ feet - ANSWER-5,280 Ft

1 SY = ___ SF - ANSWER-9 SF

2 types of Elevations: - ANSWER-Architecture (FF) and Mean Seal Level (MSL) aka
FFE

4 types of foundation systems: - ANSWER-1)Spread Footings
2) Mat foundations
3)Pile Foundations

, 4)Drilled Shafts

A _____ prime contract is most common, where the owner contracts a GC who then
contracts a SC. - ANSWER-Single

A ______ ______ is the first option to be removed from the plans if a budget cut is
needed to reduce cost of project. - ANSWER-Deductive Alternate

A safety factor of __ is generally used for supporting load limits. - ANSWER-3

Addendum: - ANSWER-A document describing an addition, change, correction, or
modification to contract documents. An addendum is issued by the design professional
during the bidding period or prior to the award of contract, and is the primary method of
informing bidders of modifications to the work during the bidding process. Addenda
become part of the bidding process.

After a waste allowance is made, the quantities are called _____ ___________. -
ANSWER-Gross Quantities

Amendment: - ANSWER-A modification of the contract by a subsequent agreement.
This does not change the entire existing contract but does alter the terms of the affected
provisions or requirements.

Area Method: - ANSWER-A construction cost estimating system employing unit square
foot costs multiplied by the adjusted gross floor area of a building.

Area of a circle: - ANSWER-πr²

Area of triangle: - ANSWER-(1/2)bh

Area: - ANSWER-A measurement of a given planar region or of the surface of a solid.

Before a waste allowance is factored, the quantities are called ____ __________. -
ANSWER-Net Quantities

Belled Pier Length & Overburden calc: - ANSWER-

Blows per feet: - ANSWER-Tests bearing capacity of rock

Board feet for a 2x8 x 16' long: - ANSWER-2 x 8 x 16 /12 = 21.33 Board Feet

Board feet: - ANSWER-TxWxL / 12

Bolster: - ANSWER-in concrete, an individual or continuous support used to hold
reinforcing bars in position. usually used in slab work.

Written for

Institution
COSC 275
Course
COSC 275

Document information

Uploaded on
August 28, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LUCKYSTAR2022 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
910
Member since
4 year
Number of followers
724
Documents
9620
Last sold
2 weeks ago
LUCKYSTAR2022

Hi there well come to luckystar2022. Here you will find guaranteed quality solution for Nursing and any other Accademic related notes, exams, study guides, cases and many more. 100% value for your time and money. GOOD LUCK

3.5

156 reviews

5
62
4
26
3
25
2
8
1
35

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions