100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
2018 ICC Test Questions With Verified Answers $11.49   Add to cart

Exam (elaborations)

2018 ICC Test Questions With Verified Answers

 5 views  0 purchase
  • Institution
  • ICC

2018 ICC Test Questions With Verified Answers code - ANS A collection of requirements that pertain to a specific subject and regulate specific practices Model code - ANS written set of regulations that provides the means for exercising reasonable control over construction and is available ...

[Show more]

Preview 3 out of 18  pages

  • August 29, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (265)
avatar-seller
Studyclock
2018 ICC Test

code - ANS A collection of requirements that pertain to a specific subject and regulate specific
practices

Model code - ANS written set of regulations that provides the means for exercising reasonable
control over construction and is available for adoption by cities, counties, state or country. Such




K
codes are frequently amended by adopting jurisdictions with changes that are desirable for legal
or local needs.




C
Building code - ANS A legal document that regulates the construction of buildings and
structures. It also regulates the installation of fixtures, equipment and accessories




LO
Purpose of codes - ANS To protect the public health, safety and welfare by regulating
construction

Performance Regulation - ANS The purpose to be accomplished and allows design and
engineering professionals to select alternative methods and materials as long as they meet the
YC
minimum requirements for health safety and welfare.

Prescriptive Regulation - ANS Describes exactly what methods and materials are to be used
as well as the size and location of components.

States by the federal government - ANS Who has the authority to adopt codes?
D

Standard - ANS A published technical document that represents an industry consensus on
how a material or assembly is to be designed, manufactured, tested or installed so that a
U


specific level of performance is obtained.

ICC - ANS Non profit organization dedicated to developing a single set of comprehensive and
ST




coordinated model construction codes.

Hammurabi - ANS Who is best known for establishing the first building code?

Benefits of state codes - ANS Uniformity and compatibility, Elimination of unjustifiably
restrictive requirements, and uniform, timely, and appropriate acceptance of new products and
technology

Characteristics of the icc code development process - ANS Anyone may submit a proposed
code change, code proposals are debated at public hearings, and participation is free and open
to all interested parties

,Performance type code - ANS Allows flexibility, provided the final outcome meets the code's
intent

BOCA, ICBO, SBCCI - ANS What are the 3 model code organizations that formed the icc
beginning in 1994?

industry organizations - ANS Standards are primarily developed by what?

Referenced Standard - ANS An enforceable extension of the code




K
Chapter 1 - ANS The intent and purpose of an icc model code is stated in what chapter of that
code?




C
reference - ANS The international codes can be adopted by what?




LO
The federal government - ANS Who grants the authority to adopt codes?

Referencing that specific edition - ANS A model code cannot be adopted without what?

Determined by the population - ANS The maximum number of voting representatives for an icc
YC
governmental member is determined by who?

ICC Evaluation Service report - ANS These items are found in what report:
A detailed description of the method or material being used.
The manufacturers name and address.
Limitations of the method or material.
D

ICC interpretation service - ANS Provides interpretations of misunderstood or confusing code
requirements.
U


Prohibits alternative methods or materials - ANS An adopted code may become invalid if it...?
ST




Final voting is done by icc governmental representatives - ANS What is a key characteristic of
the code development process?

Offset the cost of departmental operations - ANS Permit and plan review fees are collected to

value of land - ANS What is not typically a consideration when calculating a building permit
fee?

Type of construction and occupancy group - ANS ICC's building valuation Data table is based
on what 2 things?

, false information on the application, incorrect information on the plans, or failure to follow the
code. - ANS A building permit may be revoked for what 3 reasons?

Zone - ANS An area or district in a city or town under special restrictions as to the types of
buildings that may be constructed is known as what?

Benefits of zoning codes - ANS These are 3 benefits of what code:
Provides adequate ventilation and privacy
Reduces street congestion
Controls noise, glare, pollution, and odor.




K
A map and the text - ANS Two parts of a zoning ordinance are




C
Appeal to the zoning board of appeals for a variance - ANS What can a citizen do If the
setbacks for a proposed building do not meet the zoning ordinance due to an irregular shaped
lot?




LO
The sale of the nonconforming property to another owner - ANS Nonconforming use provisions
in the zoning code do not prohibit what?

Variance - ANS An easing of the terms of the zoning ordinance
YC
The most stringent requirement - ANS What is enforced when there is a conflict between the
building code and zoning ordinance?

1924 - ANS When was the standard zoning enabling act established by the us department of
commerce?
D

Industrial, residential, commercial - ANS What are the three major zoning districts?
U


Uses that existed before the zoning ordinance was in effect - ANS Zoning ordinances must
include provisions for nonconforming uses, which are?
ST




License to build - ANS A building permit is _____

Verify compliance with minimum construction standards - ANS One of the primary reasons for
requiring a building permit is to_____

Construction Documents - ANS Plans and specifications necessary for obtaining a permit

specification - ANS A written description that spells out the qualitative requirements for
products, materials, and workmanship including installation, testing and performance criteria for
a proposed project.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyclock. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67474 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart