Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
COSC 153 2024 LATEST UPDATE CORRECT 100% $12.99
Ajouter au panier

Examen

COSC 153 2024 LATEST UPDATE CORRECT 100%

 0 fois vendu
  • Cours
  • COSC 153
  • Établissement
  • COSC 153

Any successful relationship relies on successful ___________ - ANSWER Communication ________ document prepared by a subcontractor or general contractor where they seek clarification and direction on questions related to the contract documents - ANSWER request for information _______ is The fi...

[Montrer plus]

Aperçu 2 sur 15  pages

  • 16 octobre 2024
  • 15
  • 2024/2025
  • Examen
  • Questions et réponses
  • cosc 153
  • COSC 153
  • COSC 153
avatar-seller
shantelleG
COSC 153 2024 LATEST UPDATE CORRECT
100%
Any successful relationship relies on successful ___________ - ANSWER Communication



________ document prepared by a subcontractor or general contractor where they seek clarification and
direction on questions related to the contract documents - ANSWER request for information



_______ is The first formal communication under the construction contract - ANSWER Notice to Proceed



why is cost estimating so important? - ANSWER -Determines a company's competitive position in the
market

-Drives profitability, cash flow, capital investment and growth

-Provides critical first impression to clients



After the contract is signed, any change to the contract amount is processed as a(n): - ANSWER Change
Order



__________ is a written order signed by a contracting officer, directing the contractor to make a change
to the contract original scope. - ANSWER CHANGE ORDER



Tracks all major equipment and material - shows at least submittal dates, approval date, fabrication time
(lead time), release dates, date needed on site, date available, actual delivery and contact information
for supplier. Tellepsen showed you an example in class. - ANSWER material/equipment tracking log



____________ is the practice of committing to high value work while avoiding overcommitting or
committing to low value work. - ANSWER Commitment Management



Which of the following is NOT a type of submittals? - ANSWER RFI

, ____________ Entails the calculation of all materials, equipment and man-hours needed to complete
the work - ANSWER Take Off



The amount of labor, materials, and other costs that a contractor anticipates for a project as summarized
in the contractor's bid proposal for the project is called ______________ - ANSWER Estimate




If an owner releases an RFP then what type of selection process is more likely to be used in the
construction of a project? - ANSWER Best Value Selection



___________ is a wall that supports any vertical load in addition to its own weight - ANSWER Bearing
Wall



__________ is a basic building method that uses just a few hefty posts and beams to support an entire
structure. Contrasts with stud framing - ANSWER Post and Beam Method



What does HVAC stands for? - ANSWER Heat, Ventilation and Air Conditioning



What are examples of supplemental information provided by Owners to all contractors prior to bidding
on new contracts? - ANSWER Soils and Testing Reports, Job Signage Requirements



Can a Heavy Civil Specialty Contractor be a General Contractor? - ANSWER True



Should you start actual Construction activities without an official Notice to Proceed. - ANSWER No



The Egyptians used calcined gypsum as a cement, what did the Greeks and Romans use to create their
mortar? - ANSWER Lime



The purchasing of construction services is often referred to as _________ - ANSWER Procurement



____________ addresses aesthetic impact, user perceptions, appropriateness of building materials -
ANSWER Quality

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur shantelleG. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour $12.99. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

65040 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 15 ans

Commencez à vendre!
$12.99
  • (0)
Ajouter au panier
Ajouté