100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NERC QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
17-05-2023
Written in
2022/2023

A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans? - Answer- D. Regional Reliability Organization for the area. The transmission operator that you work for is installing new relays on some of their major transmission tie lines using newer technology. Who should your company notify before work is begun? - Answer- C. Neighboring Transmission Operators, Balancing authorities, and Generator Operators. When shall the transmission Operators and balancing authorities review and update emergency plans? - Answer- A. Annually When the responsible entity tags a dynamic schedule, what values should it use for the energy profile? - Answer- Expected average MW profile for each hour. You are reliability coordinator in the eastern interconnection. Transmission Operator AB is in your Reliability Area. Transmission Operator AB reports that a 600 MW generator that tripped offline has caused an overload of a 345/138/13KV Inter-tie Transformer Bank. You realize that if the overloaded transformer trips off line, it would create an IROL. There are several Interchange Transactions that have parallel flows that are flowing through that transformer. What should you do? - Answer- D. Issue a TLR on enough interchange transactions starting with the lowest priority and working up, until enough are curtailed to relieve the transformer from its overload condition. Which entities may determine the deviation of a dynamic schedule constitutes a Reliability concern? Also, what entity must notify of that determination and the reason for the determination? - Answer- B. A Reliability Coordinator or transmission operator makes the determination and must notify the purchasing-selling entity. Which entity would make the original request for an EEA event? - Answer- A. Balancing Authority At 0620 local time, interconnection frequency is 60.025 Hz. Balancing Authority A's ACE at that time is -100MW and it's L10 value is 50MW. By 0625, it's ACE has changed to -25MW and the frequency has decreased to 60.012 Hz. By 0630, A's ACE is -5MW and frequency is 60.001 Hz. For the 10 minute period, balancing authority A's average ACE was 55MW. What control performance standard has the BA violated(if any)? - Answer- B. CPS 2 T

Show more Read less
Institution
NERC
Module
NERC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Module
NERC

Document information

Uploaded on
May 17, 2023
Number of pages
14
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
Follow You need to be logged in order to follow users or courses
Sold
2053
Member since
4 year
Number of followers
1446
Documents
51180
Last sold
3 hours ago

3.8

353 reviews

5
177
4
61
3
46
2
16
1
53

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions