Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

3rd class stationary steam engineer license prep questions with complete solutions LATEST 2024.

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
23-03-2024
Written in
2023/2024

3rd class stationary steam engineer license prep questions with complete solutions LATEST 2024.

Institution
Module

Content preview

1




3rd class stationary steam engineer license prep questions
with complete solutions LATEST 2024

_________ are necessary for complete combustion - ANS time, temperature, mixture,
and atomization

if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - ANS
214.7

a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at
398 PSI. The blowdown is______psi - ANS 12

an oil cooler is commonly used with a(n) ________ when operating in conjunction with a
turbo-generator - ANS steam turbine

a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam
temperature of 500 degrees Fahrenheit. The steam produced is _______ steam - ANS
superheated

the economizer on a boiler is used to _______ - ANS add heat to the feed water

blowers are normally used with________ boilers - ANS water tube

overheating of tubes on a boiler can be caused by________ - ANS scale on tubes

carbon dioxide in a condensate return system causes_________ - ANS channeling

a ________ pump is a positive displacement pump - ANS reciprocating

a boiler generating 6000 lb of steam/hr produces _______btu/hr - ANS 6,000,000

a bottom blowdown is performed on a boiler to _____ - ANS discharge sludge and
sediment

water columns are connected to the boiler with a minimum of _______" pipe - ANS 1

the minimum size of a water column blowdown valve is_______". - ANS 3/4

the maximum size bottom blowdown valve on a boiler is_________". - ANS 2 1/2

a ________ allows condensate to pass through, but stops Steam. - ANS a steam trap

, 2



when taking over a shift, the first thing to do is check the________ - ANS water level in
each boiler

according to the asme code, a high-pressure boiler having more than 500 square feet of
heating surface shall have________ - ANS two or more safety valves

the probable cause of an increase in temperature of gases of combustion at the boiler
Outlet is____ - ANS dirty heating services

boilers in battery equipped with________ must have two main steam stop valves and a
free-flowing drain between them - ANS manhole openings

in order to be sure the gauge glass is indicating an accurate water level reading, the
stationary engineer should______ - ANS blowdown the gauge glass

a continuous blowdown line is located___ - ANS in the Steam and water drum well
below the nowl

a temperature reading of 80 degrees Celsius is equal to_________°f - ANS 176

a chimney temperature of 250 degrees Fahrenheit above steam temperature
indicates_______ - ANS poor efficiency

a manometer is red in________ - ANS inches of water

the boiling point of water will____ with an increase in pressure - ANS be raised

if a lather is not obtained when performing a soap hardness test, the water sample
is_______ - ANS hard

combustion efficiency can be increased when air is________ - ANS preheated

______ draft is produced by a fan located between the boiler and the chimney - ANS
induced

the overspeed trip on a steam turbine should be tested ______ - ANS before putting the
steam turbine on-line

a high CO2 reading in the gases of combustion is a sign of____ - ANS High combustion
efficiency

the purpose of chemically treating feedwater is to________ - ANS turn scale-forming
salts to a non adhering sludge

Written for

Module

Document information

Uploaded on
March 23, 2024
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£19.81
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
supremetutor South University
Follow You need to be logged in order to follow users or courses
Sold
449
Member since
5 year
Number of followers
442
Documents
3754
Last sold
1 year ago

4.0

68 reviews

5
35
4
13
3
10
2
4
1
6

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions