Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Core Curriculum Module 6 Basic Rigging Trade Terms Exam Questions And Answers

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
17-04-2024
Written in
2023/2024

Core Curriculum Module 6 Basic Rigging Trade Terms Exam Questions And Answers bridle - ANS A configuration using two or more slings to connect a load to a single hoist hook. Lifting clamp - ANS A device used to move loads such as steel plates or concrete panels without the use of slings. Load - ANS The total amount of what is being lifted, including all slings, hitches, and hardware. Load control - ANS The safe and efficient practice of load manipulation, using proper communication and handling techniques. Load stress - ANS The strain or tension applied on the rigging by the weight of the suspended load. One-rope lay - ANS The lengthwise distance it takes for one strand of a wire rope to make one complete turn around the core. Plane - ANS A surface in which a straight line joining two points lies wholly within that surface. Splice - ANS To join together. Threaded shank - ANS A connecting end of a fastener, such as a bolt, with a series of spiral grooves cut into it. The grooves are designed to mate with grooves cut into another object in order to join them together. ANSI hand signals - ANS Communication signals established by the American national standards institute (ANSI) and used for

Show more Read less
Institution
NCCER
Module
NCCER

Content preview

Core
Curriculum
Module
6
Basic
Rigging
Trade
Terms
bridle
-
ANS
A
configuration
using
two
or
more
slings
to
connect
a
load
to
a
single
hoist
hook.
Lifting
clamp
-
ANS
A
device
used
to
move
loads
such
as
steel
plates
or
concrete
panels
without
the
use
of
slings.
Load
-
ANS
The
total
amount
of
what
is
being
lifted,
including
all
slings,
hitches,
and
hardware.
Load
control
-
ANS
The
safe
and
efficient
practice
of
load
manipulation,
using
proper
communication
and
handling
techniques.
Load
stress
-
ANS
The
strain
or
tension
applied
on
the
rigging
by
the
weight
of
the
suspended
load.
One-rope
lay
-
ANS
The
lengthwise
distance
it
takes
for
one
strand
of
a
wire
rope
to
make
one
complete
turn
around
the
core.
Plane
-
ANS
A
surface
in
which
a
straight
line
joining
two
points
lies
wholly
within
that
surface.
Splice
-
ANS
To
join
together.
Threaded
shank
-
ANS
A
connecting
end
of
a
fastener,
such
as
a
bolt,
with
a
series
of
spiral
grooves
cut
into
it.
The
grooves
are
designed
to
mate
with
grooves
cut
into
another
object
in
order
to
join
them
together.
ANSI
hand
signals
-
ANS
Communication
signals
established
by
the
American
national
standards
institute
(ANSI)
and
used
for
load
navigation
for
Mobil
and
overhead
cranes.
Cribbing
-
ANS
Material
used
to
either
support
a
load
or
allow
removal
of
slings
after
the
load
is
landed.
Also
called
blocking.
Eyebolt
-
ANS
an
item
of
rigging
hardware
used
to
attach
a
sling
to
a
load
grommet
sling
-
ANS
a
sling
fabricated
in
an
endless
loop
Pad
eye
-
ANS
a
welded
structural
lifting
attachmentPowered by TCPDF (www.tcpdf.org)
1 / 1

Written for

Institution
NCCER
Module
NCCER

Document information

Uploaded on
April 17, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£6.93
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclock Ashford University
Follow You need to be logged in order to follow users or courses
Sold
872
Member since
3 year
Number of followers
492
Documents
8822
Last sold
4 days ago

4.2

228 reviews

5
130
4
42
3
34
2
10
1
12

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions