NLC WLE Ch 2 Question and answers correctly solved
NLC WLE Ch 2 Question and answers correctly solved According to OSHA, every job must begin with ______ - correct answer A briefing Name the 5 steps of the grounding process - correct answer 1. Identify 2. Disconnect 3. Test 4. Clean 5. Ground When is a line officially de-energized? - correct answer When it has been tested and grounded Which method of testing should not be used? - correct answer Buzz testing What is the purpose of installing protective grounds? - correct answer To create a low resistance path for current to flow What is the goal of cleaning a connection point? - correct answer Decrease resistance by clearing a path for as much current to flow as possible Apprentices do a lot of _____ - correct answer Cleaning How often should a neutral be grounded in a four-wire WYE circuit? - correct answer At least 4 times per mile The deeper a temporary grounding rod (TGR) is placed, _________. - correct answer The less resistan
Written for
- Institution
- FCTC
- Module
- FCTC
Document information
- Uploaded on
- July 4, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nlc wle ch 2
-
nlc wle ch 2 question and answers correctly solved
Also available in package deal