Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

DBIA- Principles of Design-Build and Post Award And Contracts Questions And Answers With 100% Correct Answers

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
03-08-2024
Written in
2024/2025

Contract Format - cost per piece - Unit Price Single point of responsibility for both design & construction is an attribute of what delivery method? - Design Build Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972 Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. - Clinger Cohen Act/Defense Procurement Reform Act 1996 The level of quality that any average Design Professional would be able to perform given the circumstances. - Standard of Care Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), - Design Bid Build Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. - CM at Risk Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. - Design Build Procurement Method - Most Familiar - Low Bid Procurement Method - Common for A/E - Negotiated (Qualifications Based)Procurement Method - Qualifications and Price - Best Value Procurement Method - Direct - Sole Source Contract Format w/ agreed upon fixed price - Lump Sum Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - Cost Plus Fee Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. - GMP (Guaranteed Maximum Price) Contract Format - established cost/benchmark determined jointly by project team. - Target Price Federal Government passed bond requiring payment and performance bonds on all public works, what year? - Miller Act 1935 Successful Design Build requires _____ & _______ between participants - Trust, Flexibility Singular responsibility for both design & construction was first codified by ____ - Hammurabi Owner provided items such as 20% design or more and provides prescriptive specs at RFP. - Bridging Documents Owner is responsible for implied warranties in the sufficiency of the specifications. - Spearin Doctrine ____ ____ should identify end results. - Performance Requirements The process of checking milestones along the way for completeness. - SubstantiationOwner requiring specific products or methods be instituted by DB team in order to achieve desired performance. - Prescriptive T/F Detailed estimating is the Building systems approach to estimating - False T/F feasibility estimate is cost model and establishes budget for project - False

Show more Read less
Institution
DBIA- Principles Of Design-Build And Post Award An
Module
DBIA- Principles of Design-Build and Post Award An

Content preview

DBIA- Principles of Design-Build and
Post Award And Contracts
Contract Format - cost per piece - Unit Price



Single point of responsibility for both design & construction is an attribute of what delivery method? -
Design Build



Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972



Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build. - Clinger Cohen Act/Defense Procurement Reform Act 1996



The level of quality that any average Design Professional would be able to perform given the
circumstances. - Standard of Care



Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), -
Design Bid Build



Project Delivery method allowing the contractor to come on board very early in design for
preconstruction services yet maintains separation between Designer and Builder contractually. -
CM at Risk



Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing
incremental packages. - Design Build



Procurement Method - Most Familiar - Low Bid



Procurement Method - Common for A/E - Negotiated (Qualifications Based)

, Procurement Method - Qualifications and Price - Best Value



Procurement Method - Direct - Sole Source



Contract Format w/ agreed upon fixed price - Lump Sum



Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - Cost
Plus Fee



Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only
up to a certain amount. - GMP (Guaranteed Maximum Price)



Contract Format - established cost/benchmark determined jointly by project team. - Target Price

Federal Government passed bond requiring payment and performance bonds on all public works, what
year? - Miller Act 1935



Successful Design Build requires _____ & _______ between participants - Trust, Flexibility



Singular responsibility for both design & construction was first codified by ____ - Hammurabi



Owner provided items such as 20% design or more and provides prescriptive specs at RFP. -
Bridging Documents



Owner is responsible for implied warranties in the sufficiency of the specifications. - Spearin
Doctrine



____ ____ should identify end results. - Performance Requirements




The process of checking milestones along the way for completeness. - Substantiation

Written for

Institution
DBIA- Principles of Design-Build and Post Award An
Module
DBIA- Principles of Design-Build and Post Award An

Document information

Uploaded on
August 3, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£6.48
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICMATERIALS City University New York
Follow You need to be logged in order to follow users or courses
Sold
615
Member since
3 year
Number of followers
185
Documents
10570
Last sold
1 week ago

4.0

99 reviews

5
54
4
13
3
21
2
3
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions