NICET LEVEL III WATER BASED LAYOUT Exam Questions And Answers Updated 2024/2025

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
24-11-2024
Written in
2024/2025

©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e NICET LEVEL III WATER BASED LAYOUT Exam Questions And Answers Updated 2024/2025 General Conditions - answerWhat is not included in the technical specification? •contract •specifications •contract drawings - answerBid documents include? General Conditions - answerCodes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect. Supplementary Conditions - answerAddendums, time schedules, working days allowed, delay agreements, payment schedules Construction Specifications Institute (CSI) - answerSpecifications typically use what format? Contractors - answerConstruction manager concept is when the owner contracts with the construction manager who oversees ____________ working on the project Design-Build Concept - answerSometimes referred to as a turn-key type agreement or contract? general contractor - answerMultiple Prime Contractor Method has the intent is eliminate the middleman __________ __________. •architectural/structural contractor •mechanical contractor •electrical contractor - answerMultiple prime contractor method involve more than one prime contractor which consist of? ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e •federal government •general services administration (GSA) •large companies - answerWho commonly uses the multiple prime contractor method? Owner, architect, general contractor, subcontractor - answerTraditional method contract uses the typical chain of command which is? •open bid method •bid-by invitation procedure •direct contractor selection - answerGeneral contractors can be chosen in a number of different ways which is? General category and supplementary conditions - answerContract conditions is divided into two categories which is? Addendum - answerChanges to the contract or other modifications. •up-front payments •progress payments •lump sum - answerTypes of payment schedules are? Bidding requirements, sample forms, conditions of the contract and specifications, including general conditions and supplementary conditions - answerWhat comprises the project manual? •contract itself •contract conditions •specifications •drawings - answerContract documents include: Preliminary, bid, approval, construction, as-built - answerDrawings have different stages which are? Request for proposal (RFP) - answerOftentimes a project will begin with a _________. •certified value specialist •owner's representatives •designers and consultants ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 3 | P a g e •the construction team •cost estimator •building management staff •third-party (independent) reviewers - answerValue-engineering team typically consist of? •Information gathering •brainstorming •analysis •development •recommendations - answerValue-engineering typically goes through phases which are? Planning stage - answerAt what stage does value-engineering provide the most benefit? Value = Function / Cost - answerValue-engineering equation is: Low cost and high value - answerValue-engineering cost vs value goal is? Giving careful consideration to all options, without sacrificing the project's goals. - answerValue-engineering of a project involves: Request for Information (RFI) - answerDiscrepancies between the plans and specifications should be resolved using a? 36 inches - answerMinimum distance between the deflector and the top of the storage shall be? 8 foot on center - answerThe minimum distance control modes sprinklers can be spaced apart is? 12 inches - answerThe minimum distance an upright control mode sprinkler shall be permitted to be offset horizontally from the pipe is? 12 inches - answerThe minimum distance upright control mode sprinkler shall be located above the centerline of the pipe for pipe greater than 4 inch nominal in diameter? 8 foot - answerThe minimum distance ESFR sprinklers can be spaced apart is? 12 sprinklers located on 3 branch lines - answerHow many sprinklers are required to be calculated on ESFR systems?

Show more Read less
Institution
NICET
Module
NICET









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET
Module
NICET

Document information

Uploaded on
November 24, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.



NICET LEVEL III WATER BASED
LAYOUT Exam Questions And Answers
Updated 2024/2025



General Conditions - answer✔What is not included in the technical specification?
•contract
•specifications

•contract drawings - answer✔Bid documents include?

General Conditions - answer✔Codes, standards, Authority Having Jurisdiction (AHJ), clean-up,
safety requirements, barricades, fencing, insurance and bond requirements, ect.

Supplementary Conditions - answer✔Addendums, time schedules, working days allowed, delay
agreements, payment schedules

Construction Specifications Institute (CSI) - answer✔Specifications typically use what format?

Contractors - answer✔Construction manager concept is when the owner contracts with the
construction manager who oversees ____________ working on the project

Design-Build Concept - answer✔Sometimes referred to as a turn-key type agreement or
contract?

general contractor - answer✔Multiple Prime Contractor Method has the intent is eliminate the
middleman __________ __________.
•architectural/structural contractor
•mechanical contractor

•electrical contractor - answer✔Multiple prime contractor method involve more than one
prime contractor which consist of?

1|Page

, ©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
•federal government
•general services administration (GSA)

•large companies - answer✔Who commonly uses the multiple prime contractor method?

Owner, architect, general contractor, subcontractor - answer✔Traditional method contract
uses the typical chain of command which is?
•open bid method
•bid-by invitation procedure

•direct contractor selection - answer✔General contractors can be chosen in a number of
different ways which is?

General category and supplementary conditions - answer✔Contract conditions is divided into
two categories which is?

Addendum - answer✔Changes to the contract or other modifications.
•up-front payments
•progress payments

•lump sum - answer✔Types of payment schedules are?
Bidding requirements, sample forms, conditions of the contract and specifications, including
general conditions and supplementary conditions - answer✔What comprises the project
manual?
•contract itself
•contract conditions
•specifications

•drawings - answer✔Contract documents include:

Preliminary, bid, approval, construction, as-built - answer✔Drawings have different stages
which are?

Request for proposal (RFP) - answer✔Oftentimes a project will begin with a _________.
•certified value specialist
•owner's representatives
•designers and consultants

2|Page
£9.96
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
Follow You need to be logged in order to follow users or courses
Sold
611
Member since
2 year
Number of followers
179
Documents
24145
Last sold
2 days ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

122 reviews

5
58
4
22
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions