100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Chapters 9 & 10 CSM FINAL REVIEW QUESTIONS WITH SOLUTIONS

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
02-01-2025
Written in
2024/2025

Chapters 9 & 10 CSM FINAL REVIEW

Institution
Certified Scrum Master
Module
Certified Scrum Master








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Certified Scrum Master
Module
Certified Scrum Master

Document information

Uploaded on
January 2, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Chapters 9 & 10 CSM FINAL REVIEW

Schedule - answerWhat is the primary tool for project planning?

Gantt charts and network diagrams - answer The two types of schedules introduced in
this chapter are

Show overall length of the project and each activity - answer Gantt charts are used to

Shows the relationship between activities - answerWhat is the advantage of using the
network diagram?

Steel or concrete structure - answer Which of the following is not a factor to use when
determining what type of schedule to use?

Float schedules - answer Which of the following is not one of the schedules introduced
in this chapter?

Three weeks - answerWhat is the typical period of time using a short-interval schedule?

The plotting stage - answerAll of the following are stages of building a schedule except

Create a construction activity list - answerThe first thing that must be done in the
planning stage is what?

To take a single task and break it down into finer detail - answerThe purpose of a mini
schedule is to accomplish what ?

Concrete curing time - answerSome construction activities take time, but do not require
any work effort, which is an example of such an activity that must be built into the
schedule?

Early as possible - answerAs the schedule changes subcontractors should be notified
when?

True - answerDuring the planning stage, you can use the work breakdown schedule to
make sure you have all the activities needed and to organize an identify workgroups?

The hours/time budget is the estimator's numbers which contractors use while bidding
to get the work - answerWhen estimating the duration of each task, which of the
following is important to match or at least consider?
£11.16
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420 Phoenix University
Follow You need to be logged in order to follow users or courses
Sold
652
Member since
2 year
Number of followers
323
Documents
33704
Last sold
1 day ago
NURSING,TESTBANKS,ASSIGNMENT,AQA AND ALL REVISION MATERIALS

On this page, you find all documents, package deals, and flashcards offered by seller julianah420

4.3

147 reviews

5
101
4
20
3
7
2
5
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions