[Show more]When must a handrail be added to stairwell? CORRECT ANSWER When it is 30 inches or one having four or more risers. 
 
What are four concerns a CHST must address regarding unsafe use of ladders and stairwells? CORRECT ANSWER Slippery conditions, handrails on specific types, not used for storage and e...
Preview 2 out of 6 pages
Add to cartWhen must a handrail be added to stairwell? CORRECT ANSWER When it is 30 inches or one having four or more risers. 
 
What are four concerns a CHST must address regarding unsafe use of ladders and stairwells? CORRECT ANSWER Slippery conditions, handrails on specific types, not used for storage and e...
Is a trench considered an excavation? CORRECT ANSWER Yes 
 
What is the distance a worker needs to maintain from power lines? CORRECT ANSWER 10ft 
 
What does the severity of electric shock depend on? CORRECT ANSWER Path of current, amount of current, duration of exposure 
 
True or false: electrica...
Preview 3 out of 17 pages
Add to cartIs a trench considered an excavation? CORRECT ANSWER Yes 
 
What is the distance a worker needs to maintain from power lines? CORRECT ANSWER 10ft 
 
What does the severity of electric shock depend on? CORRECT ANSWER Path of current, amount of current, duration of exposure 
 
True or false: electrica...
employer responsibilities regarding use of GFCI CORRECT ANSWER 1. delegate implementation to 'competent person' 
2. 120V which operate at 15 to 20 amps, not permanent, equipe with GFCI 
3. applies to all cord sets not part of permanent building struction 
ain written description of th eprovisions....
Preview 3 out of 17 pages
Add to cartemployer responsibilities regarding use of GFCI CORRECT ANSWER 1. delegate implementation to 'competent person' 
2. 120V which operate at 15 to 20 amps, not permanent, equipe with GFCI 
3. applies to all cord sets not part of permanent building struction 
ain written description of th eprovisions....
When must a handrail be added to stairwell? CORRECT ANSWER When it is 30 inches or one having four or more risers. 
 
What are four concerns a CHST must address regarding unsafe use of ladders and stairwells? CORRECT ANSWER Slippery conditions, handrails on specific types, not used for storage and e...
Preview 2 out of 6 pages
Add to cartWhen must a handrail be added to stairwell? CORRECT ANSWER When it is 30 inches or one having four or more risers. 
 
What are four concerns a CHST must address regarding unsafe use of ladders and stairwells? CORRECT ANSWER Slippery conditions, handrails on specific types, not used for storage and e...
Which of the following is NOT considered a significant factor in determining the outcome of an electrocution event? CORRECT ANSWER 1. The amount of electrically resistant material present in work boots and work gloves. 
 
A Noise-Hazard Control Program (and associated Hearing Conservation Program) i...
Preview 3 out of 27 pages
Add to cartWhich of the following is NOT considered a significant factor in determining the outcome of an electrocution event? CORRECT ANSWER 1. The amount of electrically resistant material present in work boots and work gloves. 
 
A Noise-Hazard Control Program (and associated Hearing Conservation Program) i...
not less than 25 feet and not more than 75 feet CORRECT ANSWER On a construction site, fire extinguishers should be how close/how far from flammable materials? 
 
How to determine modified rate CORRECT ANSWER modification rate X manual rate 
 
If a company is cited by OSHA, you must post the violati...
Preview 2 out of 5 pages
Add to cartnot less than 25 feet and not more than 75 feet CORRECT ANSWER On a construction site, fire extinguishers should be how close/how far from flammable materials? 
 
How to determine modified rate CORRECT ANSWER modification rate X manual rate 
 
If a company is cited by OSHA, you must post the violati...
From a safety stand point which of the following is a lagging indicator? CORRECT ANSWER OSHA incidence rate 
 
A safety program begins begins by: CORRECT ANSWER Developing a policy statement. 
 
How should a manager discipline a first offense minor rule infraction. CORRECT ANSWER Oral reprimand. 
 
...
Preview 4 out of 65 pages
Add to cartFrom a safety stand point which of the following is a lagging indicator? CORRECT ANSWER OSHA incidence rate 
 
A safety program begins begins by: CORRECT ANSWER Developing a policy statement. 
 
How should a manager discipline a first offense minor rule infraction. CORRECT ANSWER Oral reprimand. 
 
...
How much tolerance between lifting points when jacking the slab? CORRECT ANSWER Half inch 
 
Welds achieve maximum strength CORRECT ANSWER When cooled to air temperature 
 
Power trowels are not required to have dead man switches CORRECT ANSWER True 
 
Do double insulated tools need be grounded? COR...
Preview 3 out of 16 pages
Add to cartHow much tolerance between lifting points when jacking the slab? CORRECT ANSWER Half inch 
 
Welds achieve maximum strength CORRECT ANSWER When cooled to air temperature 
 
Power trowels are not required to have dead man switches CORRECT ANSWER True 
 
Do double insulated tools need be grounded? COR...
Which of the following is NOT a significant factor in determining the impact of an electrocution event on a worker? CORRECT ANSWER The amount of electrically resistant material present in work boots and work gloves 
 
A Hearing Conservation Program is required under OSHA regulation 29 CFR 1926.52 (O...
Preview 3 out of 25 pages
Add to cartWhich of the following is NOT a significant factor in determining the impact of an electrocution event on a worker? CORRECT ANSWER The amount of electrically resistant material present in work boots and work gloves 
 
A Hearing Conservation Program is required under OSHA regulation 29 CFR 1926.52 (O...
An experienced engineer is NECESSARY when designing a: CORRECT ANSWER Movable scaffold system. 
 
A worker is using a jackhammer to break concrete. For this work: CORRECT ANSWER The worker must be provided with safety glasses, safety shoes, a hard hat, and hearing protection. 
 
Which term is charac...
Preview 2 out of 13 pages
Add to cartAn experienced engineer is NECESSARY when designing a: CORRECT ANSWER Movable scaffold system. 
 
A worker is using a jackhammer to break concrete. For this work: CORRECT ANSWER The worker must be provided with safety glasses, safety shoes, a hard hat, and hearing protection. 
 
Which term is charac...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.
No, you only buy these notes for $38.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
81989 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now