Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MSSC Maintenance test 1 Correctly Answered(RATED A+)

Rating
-
Sold
-
Pages
20
Grade
A+
Uploaded on
19-04-2023
Written in
2022/2023

What is an accelerometer used for? - Temperature measurement - Acoustic monitoring - Vibration measurement - Oil analysis - ANSWER Vibration measurement Corrective work is performed following preventive maintenance when __________. - The schedule calls for it - The supervisor requests it - The PM work was performed incorrectly - Problems are discovered - ANSWER Problems are discovered Slips and falls are the worst safety hazards when __________. - Cleaning fans - Mopping floors - Lifting heavy objects - Driving a tug - ANSWER Mopping floors Supply errors can be caused by relying on __________ without monitoring their performance. - Customers - Employees - Suppliers - Inspectors - ANSWER Suppliers Preventive maintenance is best described as what? - Periodic in nature - Exhausting - Breakdown repair - Flexible - ANSWER Periodic in nature A board with tool outlines for placement is called a __________ and is a good way to make sure tools are returned to their proper storage space between uses. - Storyboard - Shadow board - Board of tools - Storage bin - ANSWER Shadow board The frequency of maintenance is usually an item found on the __________. - Preventive maintenance schedule - Work order - Warranty card - Hold card - ANSWER Preventive maintenance schedule A maintenance technician should arrange to have all routine tools and supplies ready to perform preventive maintenance on a machine in order to __________. - Increase equipment downtime - Minimize equipment downtime - Make sure that the job is done correctly - Make sure that the machine parts are still available - ANSWER Minimize equipment downtime Placing tools and equipment where they can be reached with minimal strain is a characteristic of a __________. - Poorly designed workstation - Well-designed workstation - Old style workstation - Pull system - ANSWER Well-designed workstation What can be done after a corrective action form is completed? - The form is saved in a safe and secure place. - The maintenance technician reviews the work order. - The supervisor is summoned to determine whether the job is complete. - Preventive maintenance should be documented as completed. - ANSWER Preventive maintenance should be documented as completed. The first thing an employee should do when discovering a building maintenance issue that negatively impacts his/her work area is __________. - Report the situation to the supervisor - Try to fix the problem - Go home until the problem is fixed - Ignore the problem - ANSWER Report the situation to the supervisor How often the maintenance will occur is the primary consideration of what type of maintenance? - Predictive - Reactive - Responsive - Preventive - ANSWER Preventive Reactive Maintenance is considered a(n) __________ activity. - Unplanned maintenance - Planned maintenance - Highly responsive maintenance - Chemical-related maintenance - ANSWER Unplanned maintenance In a well-organized plant, it should take a worker __________ to find the right tool. - 30 seconds - 1 minute - 5 minutes - 10 minutes - ANSWER 30 seconds __________ should preside over housekeeping inspections or audits. - Unbiased auditors or inspectors - The company president - The safety team - The immediate supervisor - ANSWER Unbiased auditors or inspectors Sensor monitoring is the most useful aspect of what program? - Preventive maintenance - Predictive maintenance - Reactive maintenance - Corrective maintenance - ANSWER Predictive maintenance A workstation designed to __________ can reduce repetitive/stress injuries. - Maximize range of motions - Minimize motions - Increase unnecessary motion - Increase product output - ANSWER Minimize motions An example of preventive maintenance is __________. - Replacing components after they have failed - Scheduled replacement of minor parts that wear out quickly - Replacing an item that has been damaged - Arranging for an OSHA inspection of equipment - ANSWER Scheduled replacement of minor parts that wear out quickly What contains equipment histories as well as maintenance, service, and preventive maintenance records? - Computerized maintenance management systems (CMMS) - Computerized maintenance management information systems (CMMIS) - Equipment maintenance management software (EMMS) - All of the above - ANSWER All of the above Predictive maintenance is a type of maintenance program that does what function? - Determines regular maintenance intervals when maintenance should be performed - Predicts the specific date when maintenance should be performed - Identifies machine part or component failures before a major breakdown - Provides startup and shutdown guidelines - ANSWER Identifies machine part or component failures before a major breakdown What is an example of failure to follow preventive maintenance? - Lubricating bearings as prescribed - Skipping a scheduled cleaning - Replacing V-belts in sets - Filter replacement - ANSWER Skipping a scheduled cleaning To make sure tools remain in good working order, __________. - Store them properly - Do not use them unless absolutely necessary - Use oversized tools - Do not clean them off after use - ANSWER Store them properly When opening supplies at a workstation, place excess packaging materials where? - In the machine - On the floor - In appropriate trash/recycle bin - In the aisle - ANSWER In appropriate trash/recycle bin Bearing seals can be damaged by what? - Routine lubrication processes - Excessive lubrication - Shortening the run time - Proper burn-in - ANSWER Excessive lubrication What is most closely associated with repair of broken parts? - Preventive maintenance - Predictive maintenance - Breakdown maintenance - PDCA cycles - ANSWER Breakdown maintenance Equipment should be inspected and reported to whom at the start of the production day? - The incoming shift - The auditor - All personnel - Appropriate parties - ANSWER Appropriate parties Workers should perform an emergency shutdown of their equipment and notify their supervisor in which of the following circumstances? - They notice that the equipment temperature is gradually rising but still within allowable limits. - They hear a loud banging noise coming from the equipment. - They detect vibration levels that are within the allowable range. - They are notified of a family emergency and need to go home. - ANSWER They hear a loud banging noise coming from the equipment. __________ are not permitted on the floor of a workstation. - Extension cords - Painted lines - Trash cans - Non-slip mats - ANSWER Extension cords What is preventive maintenance defined as? - Condition-based servicing - Run-to-breakdown production - Plan-Do-Check-Act (PDCA) cycles - Routine servicing at predetermined intervals - ANSWER Routine servicing at predetermined intervals The best way to store liquids such as paint or cleaning fluids is __________. - Sealed and in a cabinet - On the workbench - Near a window for ventilation - Under the workbench for easy access - ANSWER Sealed and in a cabinet __________ should be replaced immediately if found to be missing during an equipment inspection. - Safety guarding - Foot rests - A maintenance report - A borescope - ANSWER Safety guarding When a cutting tool provides unacceptable product quality results, it should be replaced and __________. - Resharpened - Scrapped - Reused later - Repurposed - ANSWER Resharpened Perhaps the best place to store preventive maintenance records is __________. - In a safe and secure location - In the supervisor's office - In the maintenance office - A plastic folder attached to the equipment - ANSWER In a safe and secure location What should a technician do before performing preventive maintenance? - Acquire tools and supplies, then shut down the machine - Interview the operator - Review the user manual - Make sure that the machine parts are still available - ANSWER Acquire tools and supplies, then shut down the machine A borescope or fiberscope can be used to __________ internal components. - Graph vibrations of - Monitor sounds of - Visually inspect - Clean and sanitize - ANSWER Visually inspect Zero defects and breakdowns is a goal of __________. - TPM - FDA - UAW - WPA - ANSWER TPM A thorough check for a history of similar problems should occur __________. - On problems that keeps recurring at regular intervals - On problems that have not occurred in the past - On problems that warrant a repair - For new problems - ANSWER On problems that keeps recurring at regular intervals Design failure in a production line can be apparent by repeated maintenance failures and __________. - The high output achieved - Employee turnover - Supply material used - The inability to meet performance demands - ANSWER The inability to meet performance demands __________ should be disposed of in an OSHA-approved fireproof container. - Oily rags - Paper - Wood - Metal scraps - ANSWER Oily rags What is established when operating equipment is in good condition? - The best operator for the job - Normal running levels for physical characteristics - Optimal order schedules for part inventory - The storage of maintenance logs - ANSWER Normal running levels for physical characteristics What is everyone responsible for? - Scheduling maintenance after equipment breakdown - Completing work orders on time - Keeping the work area clean of dirt, dust, and debris - Filling out corrective action reports - ANSWER Keeping the work area clean of dirt, dust, and debris Results of tests, inspections, and a schedule for future maintenance can be found where? - User Manual - Statement of work (SOW) - Preventive maintenance log - The employee break area - ANSWER Preventive maintenance log The employee verifies that preventive maintenance is complete when __________. - Closing out a PM work order - Beginning a PM work order - Making random equipment inspections - Completing a corrective action report - ANSWER Closing out a PM work order A maintenance log records work performed on a piece of equipment. A maintenance log should be kept for __________. - Machines without safety guards - Two weeks following a machine failure - Machines that show signs of wear - Every machine - ANSWER Every machine Brooms and mops should be stored __________. - Next to the machine - In pair

Show more Read less
Institution
MSSC
Course
MSSC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MSSC
Course
MSSC

Document information

Uploaded on
April 19, 2023
Number of pages
20
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol West Virginia
View profile
Follow You need to be logged in order to follow users or courses
Sold
435
Member since
3 year
Number of followers
254
Documents
14103
Last sold
5 days ago

3.7

74 reviews

5
28
4
18
3
17
2
2
1
9

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions