NICET LEVEL 1 (With Error-free Answers)
4 wires correct answers what is the maximum number of 14 AWG RHH conductors which can be installed in 1/2 rigid metal conduit? 3.5'-48" to the actuator correct answers Which of the following would be an appropriate mounting height for a pull station? 1 flash per second correct answers What is the minimum flash rate for a visible notification device? 90" to the top of the device correct answers What is the minimum mounting height for audible notification devices? Such that the entire lens is not less then 80" correct answers What is the minimum mounting height for visible notification devices? Voltage=Current X Resistence correct answers What is the formula for Ohm's Law Put your meter in series with the circuit correct answers When using your mult-meter to measure, you must: Semi-annually correct answers Waterflow devices shall be tested with that frequency? Annually correct answers With what frequency shall ionization smoke detectors be given a functional test? 24 hours in normal operation, 5 minutes in alarm correct answers What are the standby power requirements for a proprietary signaling system? Shunt type correct answers Which of the following is a type of auxiliary protective signaling system? A UL listed central station A receiver located at an unlisted monitoring facility A fire department or communications center correct answers Remote station signaling systems are permitted to send signals to: 600V correct answers Non-power limited fire alarm cable shall have an insulation rating of: 20,000 CFM HVAC system serving a single floor 15,000 CFM HVAC system serving 3 floors 20,000 CFM HVAC system serving 2 floors correct answers Which of these HVAC systems would require duct detectors on supply and return?
Written for
- Institution
- NICET LEVEL 1
- Course
- NICET LEVEL 1
Document information
- Uploaded on
- June 28, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal