ICC / UST exam 2024 with 100% complete solutions
Corrosion Specialist correct answersdesigns and certifies cathodic protection system Secondary containment shall be constructed to contain at least the following volumes: correct answersA. 100% of usable capacity of primary where there is only one primary is within the secondary B. 150% of the largest container if there are multiple primary containers in a single secondary Cathodic protection tester will test cathodic protection system within __ months of installation and every __ years thereafter correct answers6 months 3 years Spill container shall meet the following requirements: correct answersA. If made of metal, exterior wall shall be protected from galvanic corrosion B. Shall have minimum capacity of 5 gallons (19 L) C. Shall have drain valve which allows drainage of the collected spill into the primary container or provide means to keep spill cont empty Overfill prevention shall alert transfer operator when tank is __% full correct answers90% Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity correct answers95% Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure correct answers150% Date that all UST systems must have Line Leak Detector installed correct
Written for
- Institution
- ICC / UST
- Course
- ICC / UST
Document information
- Uploaded on
- January 9, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal