NERC RC Exam| 102 questions| with complete solutions
NERC RC Exam| 102 questions| with complete solutions Common standard time period for station battery to handle outage of AC power to chargers Answer-8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful Answer-2 hours Transition period to backup control facility (fully functioning) Answer-2 hours Annual testing of backup control facility must prove to be functional for this long Answer-2 hours Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching personnel Answer-2 hours Every 2 years GOP's with blackstart resources shall provide how many hours of training to operating personnel responsible for startup Answer-2 hours BAL-002 default contingency reserve restoration period (following disturbance recovery period) Answer-90 minutes How often should BA calculate and record inadvertent interchange Answer-60 minutes/hourly How often should BA provide MW-hour meter readings to adjacent BA's Answer-60 minutes/hourly TLR procedure (identifying TLR level and actions to be implemented) needs updating how often Answer-60 minutes/hourly Hourly ATC for next 48 hours calculated how often Answer-60 minutes/hourly During EEA2/3 the energy deficient entity needs to update the RC how often until alert is terminated Answer-60 minutes/hourly
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 18, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
common standard time period for station battery to
-
time to restore data exchange redundancy when redu
-
transition period to backup control facility full