True/False: The only way to create an Xactimate estimate is through
XactAnalysis? - -False: At the "fundamental" level you will use the "Projects"
tab. (P.8)
-True/False: With an Internet connection you can download/upload an
XactAnalysis assignment. - -True: With an internet connection, an
assignment can be downloaded, and worked on in Xactimate. (P. 9)
-What are the steps in the 4-Step Estimating Process - -Claims Info., Sketch,
Estimate Items, & Complete (P. 14)
-True/False: It is mandatory to follow the 4-Step Estimating Process in its
exact order. - -False: It is NOT mandatory that each step be completed in
the exact order. (P.12)
-True/False: At the fundamental level of learning, it is recommended to add
or create a project from the "Control Center" tab. - -False: At the
fundamental level you can use the "Projects" tab. (P.10)
-
Prep Questions with Verified
Answers
True/False: The only way to create an Xactimate estimate is through
XactAnalysis? - -False: At the "fundamental" level you will use the "Projects"
tab. (P.8)
-True/False: With an Internet connection you can download/upload an
XactAnalysis assignment. - -True: With an internet connection, an
assignment can be downloaded, and worked on in Xactimate. (P. 9)
-What are the steps in the 4-Step Estimating Process - -Claims Info., Sketch,
Estimate Items, & Complete (P. 14)
-True/False: It is mandatory to follow the 4-Step Estimating Process in its
exact order. - -False: It is NOT mandatory that each step be completed in
the exact order. (P.12)
-True/False: At the fundamental level of learning, it is recommended to add
or create a project from the "Control Center" tab. - -False: At the
fundamental level you can use the "Projects" tab. (P.10)
-