100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PJM Practice Questions And Answers With Complete Study Solutions

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
18-04-2024
Written in
2023/2024

PJM Practice Questions And Answers With Complete Study Solutions PJM Practice Questions And Answers With Complete Study Solutions

Institution
PJM Generation
Course
PJM Generation

Content preview

PJM Practice Questions And Answers With Complete Study Solutions A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. c. 4 hours The following would be considered non -critical plant load (Select 2) A. Office Area Air Conditioners C. Lighting During a Cold Weather Alert, PJM will take which of the actions D. Assume an unavailability rate for schedule generation When PJM issues a High System Voltage Message, the GO should have its units operate at: B. The lower end of their voltage bandwidth What would the reportable Emergency Reducible Generation be if the Generator Output is 400 MW, Economic Min is 225 MW and the Emergency Min is 175 MW C. 50 MW PJM can issue the Deploy All Resources Action for D. The entire RTO, specific Control Zones, or a subset of a Control Zone if transmission limitations exist PJM has issued a Minimum Generation Alert. Your current generation is 200 MW. The Economic Minimum is 150 MW and the Emergency Min is 125 MW. How much ERG should be reported for this unit? B. 25MW Which of the following steps would PJM take as part of initiating Conservative Operations? (Select 2) A. Perform job studies looking at the loss of multiple pieces of equipment as a single event C. Initiate additional off -cost operation to limit or reduce flows across critical interfaces The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output ____ D. Immediately upon receipt of dispatch instructions Under the National Terrorism Advisory System (NTAS) there are two types of alerts: Elevated Threat Alert and A. Imminent Threat Alert What is the requested response time for members to reply to a request for SSR data? A. 10 minutes You are a Generation Owner with the following units. PJM has just requested a Supplementary Status Report (SSR). what do you report as your total "On Cost" Steam Capacity U1: ECO max, 145 - EMR max 145 Current output 140 U2 ECO max, 550 - EMR max 145 Current output 400 U3 ECO max, 400, EMR max 410 Current output 1095MW Why does PJM require an additional notification time of Unit testing 30 minutes prior to the GO/MOC performing the reactive capability testing? C. To allow PJM and TOs to make adjustments to system voltages prior to test When an outage requires verbal notification to PJM which PJM personnel should be contacted? B. Master Coordinator One of the leading causes of the 1999 Low Voltage event in PJM was ___ B. PJM's EMS at that time had only nameplate D -curve data for With whom does PJM share the results of generation reactive capability tests? A. The affected TO With the exception of intermittent resources, Over -excited (Lagging) test results are the values of MVAR output that can be sustained for how long? D. 60 min During the PJM Peak Period Maintenance Season whit is the max amount of consecutive days the outage can last? C. 9 When PJM requests a Reactive Reserve Check (RRC), how does the GO/MOC report limitations or restrictions on their unit which would prevent it from being able to follow it's reactive capability curve as recorded in eDART A. By notifying the effect TO What is the min time needed to submit a reactive capability test ticket via eDARt prior to performing the test? C. 3 business days A unit (or intermittent facility) will be considered as having passed their capability test and require no further action if their test results are within ___ of the stated limits D. 5% Even if no changes are made, MOCs/GOs must review and confirm their unit reactive capability via eDARt how ofter? D. Twice per year What is the penalty for units that do not meet their stated reactive capability during reactive capability B. There is no penalty When submitted expected capability for "new" units, what reactive capability should be used? B. Vendor supplied D -curves Which of the following statements would be considered as an implication from receiving power from an outside entity? B. Unintentional interconnection between the two areas Which of the following statements is correct concerning PJM assuming frequency of the restoration process? B. Whenever it becomes too much of a burden for any one transmission owner within the RTO Factors that help to determine the sequence of restoration of offline generation include: A. Unit availability D. Generation type Concerning the PJM requirements for critical Blackstart Generation, which of the following statements applies to the unit's capability to maintain frequency? (select 2) A. Picking up an isolated block of loads D. Dynamic offline testing of the unit's governor control Which of the following would be considered pre -tie preparations when interconnecting islands? (Select 2) A. Identification of the transmission line to tie areas together B. Recalculation of reserves C. Provide updated hydroelectric capability

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
April 18, 2024
Number of pages
18
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • pjm practice

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Nipsey Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2069
Member since
5 year
Number of followers
1527
Documents
14938
Last sold
13 hours ago
LECT EXAMS

FOR THE BEST ASSIGNMENTS,TEST BANKS,EASSY AND TO HELP IN TUTORING I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc , and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!

Read more Read less
4.1

366 reviews

5
213
4
55
3
55
2
14
1
29

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions