100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CNST Test #1 Multiple Choice || with Complete Solutions. $10.69   Add to cart

Exam (elaborations)

CNST Test #1 Multiple Choice || with Complete Solutions.

 8 views  0 purchase
  • Course
  • CNST T
  • Institution
  • CNST T

Which of the following is NOT one of the primary sectors of the construction industry? A. Heavy Civil Construction B. Industrial Construction C. Commercial Building D. Health Care Construction correct answers D. Health Care Construction Which of the following documents expresses the quality ...

[Show more]

Preview 2 out of 5  pages

  • August 4, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CNST T
  • CNST T
avatar-seller
FullyFocus
CNST Test #1 Multiple Choice || with Complete Solutions.
Which of the following is NOT one of the primary sectors of the construction industry?
A. Heavy Civil Construction
B. Industrial Construction
C. Commercial Building
D. Health Care Construction correct answers D. Health Care Construction

Which of the following documents expresses the quality of the work that is to be performed?
A. Details
B. Project manual
C. Sections
D. Plans correct answers B. Project manual

What is lean construction?
A. Philosophy that focuses on adding value with less work and the elimination of waste in the
building process.
B. Utilizing sustainability practices for construction methods.
C. Reducing costs by value engineering.
D. Fast tracking the construction project to finish faster. correct answers A. Philosophy that
focuses on adding value with less work and the elimination of waste in the building process.

All of the following are functions of Construction Management except:
A. Planning the project
B. Estimating the project
C. Scheduling the project
D. Financing the project correct answers D. Financing the project

Which of the following is the definition for project scope?
A. Sets the parameters for the work and defines what work needs to be done
B. Sets the design specifications for the project as identified by the architect
C. A set of guidelines that establishes the budget for the project
D. None of the above correct answers A. Sets the parameters for the work and defines what work
needs to be done

Which of the following is NOT a Project Delivery method?
A. Agency CM
B. CM-at-Risk
C. Design-Bid-Build
D. Design-Build correct answers A. Agency CM

What is the best description of design/build construction?
A. The general contractor is only a part of the design/build entity for the construction phases of
the project
B. The owner contracts with a design/build entity, which is responsible for the project

, C. The design/build entity designs the project, then sends it to a General Contractor for
construction
D. The owner has the project designed, then a design/build entity takes it to completion correct
answers B. The owner contracts with a design/build entity, which is responsible for the project

Open bidding is required on public projects because _____?
A. they are funded by private officials
B. they require an invitation to bid
C. they are funded by taxpayers dollars
D. they are only available to certain contractors correct answers C. they are funded by taxpayers
dollars

What is the tool used to reduce the number of bidders on a public project and to increase the
quality of the contractor pool?
A. invitation to bid
B. detailed list of the company's financial statements
C. prequalification
D. requirement for proposal statement correct answers C. prequalification

Which type of bond guarantees that the payment for a contractor's labor and materials used on
the project will be made?
A. labor and materials payment bond
B. bid bond
C. payment bond
D. performance bond correct answers A. labor and materials payment bond

Identify the correct pairing of the most common procurement method and selection criteria?
A. design-bid-build and qualifications based selection
B. design build and qualifications and prose selection
C. design build and low bid selection
D. design-bid-build and low bid selection correct answers D. design-bid-build and low bid
selection

What are three positions that typically make up members of the on-site management team?
A. Superintendent, assistant superintendent, project engineer
B. Project engineer, foreman, estimator
C. Estimator, payroll, human resources
D. Estimator, contract administrator, and payroll correct answers A. Superintendent, assistant
superintendent, project engineer

Which are factors that are commonly considered before deciding to bid on a construction job?
A. location of the project
B. size of the job
C. who the architect/ owner is
D. all of the above correct answers D. all of the above

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.69. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.69
  • (0)
  Add to cart