UNL's new College of Engineering Building (Kiewit Hall) uses which of the following project delivery methods? a. CMar b. design/build c. IPD d. P3 e. Design-Bid-Build correct answers a. CMar It is usually easy for a general contractor to obtain private bid opportunities than it is to obta...

[Show more]

Preview 2 out of 15  pages

  • August 4, 2024
  • 15
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CNST 379
  • CNST 379
avatar-seller
FullyFocus
Exam 1- CNST 379 || All Questions Answered Correctly.
UNL's new College of Engineering Building (Kiewit Hall) uses which of the following project
delivery methods?

a. CMar
b. design/build
c. IPD
d. P3
e. Design-Bid-Build correct answers a. CMar

It is usually easy for a general contractor to obtain private bid opportunities than it is to obtain
public bid opportunities.

True or False correct answers false

An RFP, will typically contain which of the following: (Select all that apply)
-Type of owner contract to be used
-Anticipated cost and desired schedule
-Time and date of bid response
-Owner's contact information
-Type of project delivery method correct answers all the above

The RFQ process, if utilized by and owner, is typically done in advance of the RFP process.(T/F)
correct answers True

Which of the follow could be considered public owners? (Select all that apply.) correct answers -
Lincoln Public Schools
-University of Nebraska - Lincoln
-Colorado Department of Transportation

A public owner can award a project to which ever firm they see fit. (T/F) correct answers false

RFP stands for request for ______________. (one word, lowercase, singular) correct answers
Proposal

Which project delivery method typically results with the least risk to the GC or Construction
Manager?
a. public Private Partnership(P3)
b. CM at Risk
c. CM not at risk
d. Design- Bid- Build
e. Design/ Build
f. IPD correct answers CM not at risk

, Which project delivery method does the architect and engineer contract directly with the general
contractor/Construction Manager?
a.Design-Bid-Build
b.CM at Risk
c. Design/Build
d.CM not at Risk
e. IPD correct answers design/ Build

Which project delivery method typically results in the owner receiving the lowest possible
project cost?
a. Integrated Project Delivery (IPD)
b.CM not at Risk
c. CM at Risk
d. Design/Build
e. Design-Bid-Build correct answers design-Bid-Build

Which project delivery methods (choose all that apply) does the general contractor/construction
manager enter into a contractual agreement with the owner BEFORE the final contract amount
has been determined?
a. IPD
b. CM at Risk
c. CM not at risk
d. design/Build
c. Design-bid- build correct answers IPD, CMar, CMR, design/build

The term "Hard Bid" is generally associated with which Project Delivery Method?
- Cmar
-design/build
-design-bid-build
-ipd
-p3 correct answers Design-bid-build

Lump sum contracts are typically used with the design-bid- build project delivery method( T/F)
correct answers true

A contractor enters into a cost plus contract with a GMP for the construction of a new hotel. The
contractor's final costs exceeds the GMP. In this instance the owner will be responsible for
reimbursing the contractor for their costs incurred that were above the GMP. (T/F) correct
answers false

GMP stands for guaranteed __________________ price. correct answers Maximum

In a unit and unit price contract, the general contractor tasks the risk on ensuring the project
quantities are accurate. correct answers false

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart