Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU C783 PROJECT MANAGEMENT EXAM LATEST COMPLETE 350 QUESTIONS AND DETAILED CORRECT ANSWERS ALREADY GRADED A+

Rating
-
Sold
-
Pages
77
Grade
A+
Uploaded on
06-08-2024
Written in
2024/2025

WGU C783 PROJECT MANAGEMENT EXAM LATEST COMPLETE 350 QUESTIONS AND DETAILED CORRECT ANSWERS ALREADY GRADED A+

Institution
WGU C783 PROJECT MANAGEMENT.
Course
WGU C783 PROJECT MANAGEMENT.

Content preview

Page 1 of 77




WGU C783 PROJECT MANAGEMENT EXAM LATEST 2024-
2025 COMPLETE 350 QUESTIONS AND DETAILED CORRECT
ANSWERS ALREADY GRADED A+
WGU C783 Project Management EXAM A

Which element of the scope statement documents the process and criteria you'll use to
determine whether deliverables are complete and satisfactory? - ANSWER-Success criteria,
otherwise known as acceptance criteria.




Name the purpose of the scope management plan. - ANSWER-It documents the procedures for
preparing the project scope statement, in other words, the WBS; defines how the deliverables
will be verified; and describes the process for controlling scope change requests.




Name the four types of project endings. - ANSWER-Starvation, integration, extinction and
addition.




This component of the scope statement documents the deliverables or items that will not be
included in the project. - ANSWER-Exclusions




Before assembling the project team, what needs must the project manager assess first? -
ANSWER-Skills required by team members.




1

,Page 2 of 77


Name the two significant processes you'll perform within the human-resources planning
process. - ANSWER-Organizational planning and staff acquisition




This process is where you'll choose team members or organizations who will work on the
project. - ANSWER-Staff acquisition.




What are the triple constraints according to CompTIA? - ANSWER-Time, cost and quality




Name the major elements of a scope document. - ANSWER-product description, key
deliverables, success and acceptance criteria, key performance indicators, exclusions,
assumptions, and constraints.




Performing this function on key deliverables results in the WBS. - ANSWER-Decomposition




An activity that cannot start until its predecessor has concluded is said to have what type of
logical relationship? - ANSWER-Finish-to-start




Name the estimating technique that bases estimates on past projects of similar size and scope.
- ANSWER-Analogous estimating.




What is the first step in examining a scope deviation request? - ANSWER-Identify the cause.


2

,Page 3 of 77




What is the most often used logical relationship? - ANSWER-Finish-to-start




Three point estimates use which three estimates to calculate the average estimate? - ANSWER-
Most likely, pessimistic, and optimistic




Placing activities into a logical sequence and determining their dependencies is called what? -
ANSWER-Activity sequencing




Describe float. - ANSWER-The difference in the length of time between the early start and late
start or the early finish and late finish of an activity on the project.




What type of scheduling chart represents task duration on a timeline and typically displays
dependencies? - ANSWER-Gantt




Name the two types of schedule formats used on most projects. - ANSWER-Gantt charts and
milestone charts.

Name the steps in validating a project. - ANSWER-Validate the business case, and then identify
and analyze stakeholders.




3

, Page 4 of 77


Name the 9 knowledge areas outlined in the PMBOK Guide. - ANSWER-Scope, time, cost,
quality, human resources, communications, risk, procurement and integration management




Name the steps in validating a business case. - ANSWER-feasibility study, justification, and
alignment to the strategic plan




In which project process group is the project charter document created? - ANSWER-Initiating




Name the project process group that begins when the project charter is approved - ANSWER-
Planning




This system assures the project doesn't deviate from the planned requirements. - ANSWER-
Change control system




Name the term that describes processes that are repeated. - ANSWER-Iterative




What type of requirement describes the elements required for a business process? - ANSWER-
Business requirements




What should come first, the project scope or the project charter? - ANSWER-The project
charter.


4

Written for

Institution
WGU C783 PROJECT MANAGEMENT.
Course
WGU C783 PROJECT MANAGEMENT.

Document information

Uploaded on
August 6, 2024
Number of pages
77
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • wgu c783
$21.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
WGU C783 PROJECT MANAGEMENT EXAM - SHOP HERE WITH ME TO get more for less!
-
6 2024
$ 30.49 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVIAGRADES Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
6431
Member since
4 year
Number of followers
456
Documents
7384
Last sold
9 hours ago
stuvia_US

Welcome To my Store# STUVIA_US My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides,Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards I am always available to assist 24/7 and answer any queries you may have . Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Read more Read less
4.8

1075 reviews

5
971
4
34
3
31
2
14
1
25

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions