100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Wisconsin Contactor Training 18 hour 2022 || A+ Graded Already. $11.09   Add to cart

Exam (elaborations)

Wisconsin Contactor Training 18 hour 2022 || A+ Graded Already.

 4 views  0 purchase
  • Course
  • Wisconsin Contactor Training 18 hour
  • Institution
  • Wisconsin Contactor Training 18 Hour

Which of the following is NOT a new Article introduced in the 2017 NEC? correct answers Article 692 How many public inputs to suggest changes were received during the revision process for the 2017 NEC? correct answers 4012 Which of the following chapters has general applications for the organ...

[Show more]

Preview 2 out of 8  pages

  • August 28, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Wisconsin Contactor Training 18 hour
  • Wisconsin Contactor Training 18 hour
avatar-seller
FullyFocus
Wisconsin Contactor Training 18 hour 2022 || A+ Graded
Already.
Which of the following is NOT a new Article introduced in the 2017 NEC? correct answers
Article 692

How many public inputs to suggest changes were received during the revision process for the
2017 NEC? correct answers 4012

Which of the following chapters has general applications for the organization of the NEC?
correct answers Chapter 1-4

According to the NEC Manual of Style, a definition must be moved to Article 100 if the
definition is being applied to the following number of Articles: correct answers More than one

Which of the following topics is NOT covered in the new 2017 NEC Article 706 on Energy
Storage Systems? correct answers DC microgrids

The PV systems regulated under the new 2017 NEC Article 691 are capable of generating at
least the following minimum number of kilowatts: correct answers 5,000 kW

Chapter 1 is composed of only two Articles. What are the titles of these two Articles? correct
answers Definitions and requirements for electrical installation

True or False: The definition of "Readily Accessible" was revised in the 2017 NEC so that either
tools or a key can be required and still meet the definition of readily accessible correct answers
False; the revised version allowed the use of a key but not a need to use tools in order to be
defined as readily accessible

Under Article 110, Part II 1,000 Volts, Nominal, or Less 110.26(A) [Working Space] the 2017
NEC now requires the width of working space be no less than the width of the equipment
enclosure or the following measurement, whichever is greater: correct answers 30 inches

What is the required wording for mandatory signage pursuant to Subsection 110.26(B) - Clear
Spaces? correct answers there is no signage requirement

What is the title of Article 200 in the 2017 NEC? correct answers Use and identification of
grounded conductors

The new sentence added to Subsection 210.5(C)(1)(b) of the 2017 NEC [Identification for
Branch Circuits; Posting of Identification Means] requires the following: correct answers The
label shall be of sufficient durability to withstand the environment involved and shall not be
handwritten

, According to the discussion of Subsection 210.12(C) in this lesson [Arc-Fault Circuit-Interrupter
Protection; Guest Rooms and Guest Suites], what is a recent improvement to the AFCI that
allows for its wider applications without having excessive "phantom" trips? correct answers new
models of the AFCI sense arc "profiles" and only trip if the arc fits a dangerous profile

Subsection 210.71(B)(2) of the 2017 NEC [Meeting Rooms; Receptacle Outlets Required; Floor
Receptacle Outlets] now requires that a meeting room 12 feet wide or wider and at least 215 sq.
ft. must have at least one floor receptacle outlet per 215 sq. ft., set at the following minimum
distance from any fixed wall correct answers At least 6 feet from any fixed wall

According to the new item #5 in Subsection 230.24(B) [Vertical Clearance for Overhead Service
Conductors] what is the required clearance above train tracks for overhead service conductors?
correct answers 7.5 m (24½ ft) over tracks of railroads

Article 250 of the 2017 NEC covers "Grounding and Bonding". How is the purpose of this
Article described in the video introducing Articles 240 and 250? correct answers Article 250
(Grounding and Bonding) covers how to avoid excessive voltage in one part of the installation
that creates the potential for damaging flows of current for which the system is not designed

Section 240.67 [Cartridge Fuses and Fuseholders; Arc Energy Reduction] sets a new maximum
fuse clearing time for larger ampere fuses [unless other conditions are met]. The new provision
takes effect on the following date: correct answers January 1, 2020

The 2017 NEC amends Subsection 250.52(B) [Not Permitted for Use as Grounding Electrodes]
to add the following, so that it may no longer be used as a grounding electrode: correct answers
Structure and structural reinforcing steel of in-ground swimming pool conductive shells or
perimeter surfaces

The discussion in this lesson on changes to 250.94(A)&(B) [Intersystem Bonding Terminations]
describes an IBT functioning: "When one system is raised above ground potential, the second
system rises to the same potential, and no voltage exists between the two grounding systems."
What is this primary purpose of an IBT (as described) intended to prevent? correct answers
Shock and fire hazards

Article 250 Part X [Grounding of Systems and Circuits of over 1000 Volts] of the 2017 NEC,
Section 250.187 [Impedance Grounded Neutral Systems], requires neutral conductor to be
insulated for the maximum neutral voltage. This Section adds an "Informational Note" clarifying
that the maximum neutral voltage in a three-phase wye system may be calculated as follows:
correct answers The maximum neutral voltage in a three-phase wye system is 57.7 percent of the
phase-to-phase voltage

Chapter 3 is arranged (as is the entire NEC) to begin with the most general or central provisions
then move towards the more specialized or most peripheral. This can be seen in the following
arrangement of Chapter 3 Articles covering these topics in the following order: correct answers
1) General - 2) Conductors - 3) Enclosures - 4) Outlets - 5) Cables - 6) Conduit - 7) Raceways

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.09. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78075 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.09
  • (0)
  Add to cart