There are several types of meetings held by the contractor on the project site. Minutes should be kept for all meetings, especially ones involving job progress. - Answer-Meeting Minutes
Is important to preserve a permanent record of the proje...
There are several types of meetings held by the contractor on the project site. Minutes
should be kept for all meetings, especially ones involving job progress. - Answer-
Meeting Minutes
Is important to preserve a permanent record of the project - Answer-Record keeping
and documentation
Documentation and record keeping _________________ by keeping track of all actions
on the project - Answer-protects all parties
Following construction, the documentation also ________________ throughout the life
of the building/facility - Answer-serves the owner
In project management, is a deliverable-oriented breakdown of a project into smaller
components. A work breakdown structure is a key project deliverable that organizes the
team's work into manageable sections - Answer-work-breakdown structure
Includes the location for:
• Storage of material
• Deliveries
• Assembly or certain work
• Part of Site Logistics plan - Answer-Staging area
Is a site-specific document or collection of documents that identifies the potential
sources of stormwater pollution, describes stormwater control measures, such as
BMPs, to reduce or eliminate the identified pollutant. - Answer-Stormwater Pollution
Prevention Plan
Is one of the main project management documents that should be created before the
project starts. It sets out the project execution strategy, key project deliverables, activity
planned dates and milestones
• Baseline schedules are also used to track project costs and create the schedule of
values for monthly payment
• Best if subcontractor input is used - Answer-A baseline schedule
Refers to the sequence or order of schedule activities that will make up the entire
duration of a project. It represents the longest path through the entirety of the project
• Critical Path is almost always shown in RED - Answer-The critical path
, Is the amount of time a particular activity can be delayed without that activity delaying
the project's completion date. - Answer-Float
reevaluates the progress of a project regularly and adjusts the schedule to ensure the
project happens as efficiently as possible. It ties in with other strategies, like lean, agile,
and work breakdown structure to build a comprehensive strategy - Answer-Short
interval scheduling
is a combination of operational research and practical development in design and
construction with an adaption of lean manufacturing principles. - Answer-Lean
construction
is a realistic way to collaboratively manage project-based production. It enables issues
to be identified and resolved and increases the chances that workflows and projects are
completed on time. - Answer-The Last Planner® System (LPS)
One who has completed a course of study in building and design, and is licensed by the
state as an architect. One who draws up plans. - Answer-Architect
Frame lumber or metal installed between the wall studs to give additional support for
drywall or an interior trim related item, such as handrail brackets, cabinets, and towel
bars. In this way, items are screwed and mounted into solid wood or metal rather than
weak drywall that may allow the item to break loose from the wall - Answer-Backing
The mixture of Portland cement, sand, gravel, and water. Used to make garage and
basement floors, sidewalks, patios, foundation walls, etc. It is commonly reinforced with
steel rods (rebar) or wire screening (mesh). - Answer-Concrete
A legal document which specifies the what-when-where-how-how much and by whom in
a construction project. - Answer-Construction Contract
Any successful relationship relies on successful ___________ - Answer-Communication
________ document prepared by a subcontractor or general contractor where they seek
clarification and direction on questions related to the contract documents - Answer-
request for information
_______ is The first formal communication under the construction contract - Answer-
Notice to Proceed
why is cost estimating so important? - Answer--Determines a company's competitive
position in the market
-Drives profitability, cash flow, capital investment and growth
-Provides critical first impression to clients
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Scholarsstudyguide. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.59. You're not tied to anything after your purchase.