2nd Year NCCER Practice Test Questions And Answers
10 views 0 purchase
Course
2nd Year NCCER Practice
Institution
2nd Year NCCER Practice
2nd Year NCCER Practice Test Questions And Answers
On drawings, heavy lines that show exterior walls are referred to as ___________________.
a) object lines
b) leader lines
c) extension lines
d) dimension lines - ANS-a) object lines
Lines on drawings used to indicate an area that has been cu...
On drawings, dimensions are placed ___________________________.
a) underneath broken lines
b) above and near the center of a line
c) on the legend
d) wherever they can be easily read - ANS-✔✔b) above and near the center of a line
The location of interior and exterior footings would be shown on the ____________.
a) site plan
b) mechanical plan
c) roof plan
d) foundation plan - ANS-✔✔d) foundation plan
,Which of the following is shown of a roof plan?
a) floor to ceiling pipe runs
b) location of foundation footings
c) outside walls
d) roof slope - ANS-✔✔d) roof slope
The abbreviation ASTM stands for ______________.
a) American Society of Testing and Materials
b) Alliance of Steel Trusts Manufacturers
c) American Specification Testing Manual
d) Allied Specialty Tool Makers - ANS-✔✔a) American Society of Testing and Materials
The longest side of a right triangle is 20 feet and the shortest side is 12 feet. How long is the third side?
a) 14 feet
b) 15.5 feet
c) 16 feet
d) 19 feet - ANS-✔✔c) 16 feet
The 3-4-5 rule is used to lay out an angle of _______________.
a) 30 degrees
b) 60 degrees
c) 90 degrees
d) 120 degrees - ANS-✔✔c) 90 degrees
, In a right triangle, the longest side is called the __________________.
a) hypotenuse
b) side A
c) hypothesis
d) right side - ANS-✔✔a) hypotenuse
For a building project, the types and quality of materials, methods of construction, and location of the
structure are included in the _________________________.
a) foundation plan
b) detail drawings
c) section views
d) specifications - ANS-✔✔d) specifications
When constructing wall panels for a platform-framed structure, the wall panels
___________________________.
a) are built in positions
b) are always placed using a crane
c) are all framed before the first panel is raised
d) are assembled on the subfloor - ANS-✔✔d) are assembled on the subfloor
After raising a wall panel for a platform frame, the panel should first be fastened to the
____________________.
a) top plate
b) foundation
c) ceiling joist
d) subfloor - ANS-✔✔d) subfloor
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Accurate. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $21.49. You're not tied to anything after your purchase.