logo-home

Accurate Solutions

Having Problems With Your Studies? Worry Less Because I Got You Covered , View My Uploads For Verified Exam Solutions That Will Enable You Score Good Grades.
#Don't Forget To Leave A Great Review!

Community

  • Followers
  • Following

52 Reviews received

9333 items

101-150 NCCCO CORE PREP EXAM REVIEW QUESTIONS AND ANSWERS 2025/2026, NCCCO Core Exam Practice Questions & Answers 2025 Review Test, NCCCO CORE EXAM QUESTIONS AND ANSWERS 2025, NCCCO CORE EXAM REVIEW TEST COMPLETE SOLUTION 2025, NCCCO CORE EXAM REVIEW TEST

(0)
$60.65
0x  sold

101-150 NCCCO CORE PREP EXAM REVIEW QUESTIONS AND ANSWERS 2025/2026 What rigging hardware device is restricted to a minimum horizontal sling angle of 45 degrees? - ANS-a hook what is one rule governing the slings that are used as the suspension syustem on a personnel platform - ANS-they never have been used for anything else When putting a mo

i x
  • Package deal
  •  • 11 items • 
  • by Accurate • 
  • uploaded  2025
i x

101-150 NCCCO CORE PREP EXAM REVIEW QUESTIONS AND ANSWERS 2025/2026

(0)
$10.49
0x  sold

101-150 NCCCO CORE PREP EXAM REVIEW QUESTIONS AND ANSWERS 2025/2026 What rigging hardware device is restricted to a minimum horizontal sling angle of 45 degrees? - ANS-a hook what is one rule governing the slings that are used as the suspension syustem on a personnel platform - ANS-they never have been used for anything else When putting a mobile crane on a barge, what is the maximum allowable barge list? - ANS-5 degrees or what the maufacturer or the qualified person indicates, whichever...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 3 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE PRACTICE – SIC QUESTIONS WITH 100% CORRECT ANSWERS 2025-2026

(0)
$13.49
0x  sold

NCCCO CORE PRACTICE – SIC QUESTIONS WITH 100% CORRECT ANSWERS 1. What should be assumed in relation to all electrical lines?: Assume all wires are ENERGIZED and dangerous. 2. How much weight should each plate of the outriggers and its blocks be able to support on a crane?: The total weight of the crane and its load. 3. Who is responsible for determining the parts of the line that are required for a lift?: The crane operator. 4. Which factor is the most important to consider regar...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 11 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE EXAM QUESTIONS AND ANSWERS 2025

(0)
$13.49
0x  sold

NCCCO CORE EXAM QUESTIONS AND ANSWERS 2025 Which of the following is an accurate statement about luffing jibs? - ANS-It raises and lowers independent from the boom What is the weakest quadrant of a boom truck? - ANS-Front What effect would blocking up the ends of the tracks have on a crane? - ANS-It would increase capacity over the ends The tipping axis of a crawler crane is? - ANS-It depends if the idler or sprocket are offset from track rollers According to ASME B30.5 what percent...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 18 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE PRACTICE QUIZ QUESTIONS & ANSWERS 2025

(0)
$10.99
0x  sold

NCCCO CORE PRACTICE QUIZ QUESTIONS & ANSWERS 2025 what is important for the operator to do when extwnding the outriggers - ANS-make visual contact or post a signalperson what is the minimum swing clearance required between the crane counterweight and any obstacle - ANS-2ft of 360 degree rotation what function do axle lockouts (osicillation locks) perform on a rough terrain crane ? - ANS-locks the rear axle and prevents oscillation what should be primary cocern of an operator when setti...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 4 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO Core Prep Test Questions With 100% Correct Answers 2025-2026

(0)
$12.99
0x  sold

NCCCO Core Prep Test Questions With 100% Correct Answers 1. What is the purpose of installing an auxiliary boom point sheave to the main boom tip?: Separate hoist lines 2. A designated Lift Director shall be assigned by the ______?: Site Supervisor 3. Who is responsible for calculating net capacity?: Crane Operator 4. Who is responsible for ensuring all rigging is supervised by a Qualified Rigger?: Site Supervisor/ Lift Director 5. Who is responsible for ensuring the crane owner is...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 15 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE EXAM REVIEW TEST QUESTIONS WITH 100% CORRECT ANSWERS 2025

(0)
$12.99
0x  sold

NCCCO CORE EXAM REVIEW TEST QUESTIONS WITH 100% CORRECT ANSWERS 2025 What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - ANS-Splicing What should be of major concern when considering surfaces for crane set up locations? - ANS-Voids, tanks, loose fill, depressions Which items are included in the suspended weight when calculating parts of line? - ANS-Load weight, rigging, load block What site condition must an operator be concerned about prior to setting up a cra...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 10 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE EXAM REVIEW TEST COMPLETE SOLUTION 2025

(0)
$13.99
0x  sold

NCCCO CORE EXAM REVIEW TEST COMPLETE SOLUTION 2025 If taking sides strain on a boom what concerns the operator the most - ANS-Boom damage If a crane load chart has capacities listed in the shaded area this means that - ANS-If overloaded structural confidence will be compromised As the layers of rope on a drum increase the allowable line Pull wil - ANS-Decrease Of the following actions which one will most likely cause a side load condition - ANS-Abruptly starting or stopping the swing ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 37 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO Core Questions & Answers 100% Verified Solution 2025

(0)
$12.99
0x  sold

NCCCO Core Questions & Answers 100% Verified Solution 2025 1. The term "Superstructure or Upper works" refers to the area of the crane: : Above the swing circle 2. A crane must be level within _______% for the load chart ratings to be valid?: 1% 3. On what principle is crane stability based?: Leverage 4. What would be the effect of moving the tipping axis closer to the cranes center of gravity?: Reduced stability 5. Which of the following matches the appropriate load chart to...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 13 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x

NCCCO CORE EXAM TEST REVIEW QUESTIONS & ANSWERS 2025-26

(0)
$10.49
0x  sold

NCCCO CORE EXAM TEST REVIEW QUESTIONS & ANSWERS 2025-26 Wire rope installed on most cranes - ANS-Right Regular Lay How many randomly broken wires in a lay length must there be on a mobile cranes hoist line before it should be removed from service? - ANS-6 Minimum design factor required for a right regular lay, boom or hoist wire rope - ANS-3.5 How many broken wires are permitted at the end connection of a pendant before it must be taken out of service - ANS-1 Type 1 rotation resista...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 4 pages • 
  • by Accurate • 
  • uploaded  2025
Quick View
i x