Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

AAAE CM Module 2 Exam New Update 2024/2025 Actual Test with complete solution

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
11-09-2024
Written in
2024/2025

AAAE CM Module 2 Exam New Update 2024/2025 Actual Test with complete solution

Institution
AAAE ACE
Course
AAAE ACE

Content preview

AAAE CM Module 2 Exam New Update 2024/2025 Actual Test with
complete solution

FAAs Airport Data and Information Program - Correct answer-guides sponsors on
collection, submission and management or airpirt data ensuring airport users most current
information-achived through AIRPORT MASTER RECORD

Airport Master Record - Correct answer-describes basic operational and services data of
the airports

Airport Data Record- 5010 Form - Correct answer-Airport operator required to complete
annually, FAA uses to complete aeronautical charts and Airport Facility Directory (A/FD)

Airport Facility Directory (A/FD) - Correct answer-pilots use as reference (runway
lengths, Airport use, elevation and runway slope)

Form 7460 Notice of Proposed Construction or Alteration-Part 157 Requirement -
Correct answer-required whenever there is proposed development

Form 5010 and NOTAMS - Correct answer-Pilits rely on information internet A/FD (provided
on Form 5010). Temporary changes are issued as NOTAMS. NOTAMS can be cancelled
when the information becomes part of the A/FD

Planning Levels - Correct answer-1 NPIAS
Statewide integrated airport systems
Regional/metropolitan integrated airport systems 4 Airport Master Plans

Basic Guiding Principle of Planning Process - Correct answer-development of a safe
efficient airport system with uniform design and operational standards

NPIAS Project Categories - Correct answer-1 Purpose-safety, rehabilitation, capacity, standards

2 Physical Component-runway, taxiway, apron, equipment acquisition 3 Type of
work-construct, expand, improve

Metropolitan (or Regional) Airport System Plan (MASP) & State Aviation System Planning
(SASP) - Correct answer-plan that asses how to integrate within the area, identifies role of
each airport in the area and forecasts proposed future activities

Airport Sysrem Planning 4 elements - Correct answer-1 system needs
identification system-wide development cost estimate
studies,surveys and other planning actions to decide which aeronautical needs will be met.
standards prescribed by state for development on non-primary public use airports

,Airport Master Plan - Correct answer-primary document for long range planning. sets
direction of development for an.
airport for up to 20 years, includes public involvement, FAA does not require that it has to be

, updated at certain time schedule but it is recommended (usually conducted every 8-15
years) Plans are completely tailored to individual airport, may be encouraged by ADO to
receive funding for AIP projects.

Goal of Master Plan - Correct answer-provide framework for future development that is cost
effective and satisfies the needs of the airport, market and community while balancing
environmental and socioeconomic impacts. Sequenced into Airport Capital Improvement
Plan and eligible for federal funding

Master Plan is intended to produce - Correct answer-1 technical report-analysis conducted

summary report-facts, conclusions and
recommendations Updated ALP
Webpage-airport information and key elements of master plan Public
Information Kit-visual aids, models, brochures to support plan

Acceptance vs. Approval - Correct answer-Accepting-FAA has reviewed the elements of
the plan to ensure sound planning techniques were applied. The FAA Approves the forecast
and ALP

Master Plan Part 1: Pre-Planning - Correct answer-type and level of detail of study needs to
be determined

Consultant Selection Guidance - Correct answer-Architectural, Engineering and Planning
Consultant Srvices for Airport Grant Projects FAA AC 150/5100-14, AIRPORT
CONSULTANTS COUNCIL's (ACC) reference "Guidelines to Selecting Airport Consultants".
Consultant selection process is governed by the BROOKS ACT -requires selection be made
based on qualifications and be awarded by fair and open selection process , consultants are
usually hired before issuing RFPs, RFQs or Statements of Qualifications (SOQ). Process start
with invitation to submit information via RFP or RFQ

Topics addressed in Master Plan study - Correct answer-1 Goals and Objectives-why is
MP study being conducted and key issues for future development
2 .Data Availability-available forecasts and current data and data needed to be collected
Forecast Horizons-ie. 5, 10 ,15 years. Planning Activity Levels are increasingly being
used Environmental Considerations-Operator should determine if Environmental
Assessment (EA) or Environmental Impact Study (EIS) will be required Schedules-
decision points requiring FAA or Sponsor approval to proceed Deliverables-work and
level of detail required
Coordination of Public Involvement- level of public involvement based on complexity of
study Budget-scope of work and fees
Part 2: Public Involvement - Correct answer-An effective PUBLIC AWARENESS
CAMPAIGN is essential. The public involvement program shares information and collaborates
on decision-making. Program should include Officials, residents, travelers, tenants, FAA-group

Written for

Institution
AAAE ACE
Course
AAAE ACE

Document information

Uploaded on
September 11, 2024
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.98
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
BUNDLED AAAE CM Exams and Study Guides 2024/2025 QUESTIONS AND ANSWERS SOLVED AND VERIFIED
-
11 2024
$ 145.78 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AMANDAHICKMAN Grand Canyon University
View profile
Follow You need to be logged in order to follow users or courses
Sold
25
Member since
2 year
Number of followers
16
Documents
1655
Last sold
1 month ago
AMANDAHICKMAN

Premium Study Guides & Exam Prep for 2024/2025: Ace Your Courses

5.0

221 reviews

5
220
4
1
3
0
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions