IEC 206
On the electrical distribution drawing, the power distribution system is labeled "power
riser." Other projects may call this a ___. - answerone-line diagram
SCCR is the acronym for ___. - answershort circuit current rating
CP is the acronym for ___. - answercontrol panel
Colors of switches, receptacles, and cover plates are typically found on the ___. -
answerarchitectural drawing
For this project, electrical specifications on the plumbing plans call for use of ___. -
answerrigid or PVC
Where there are discrepancies between specifications and the drawings, ___. -
answerspecifications take precedence over the drawings
On this project, Division 1 contains ___. - answeroverall project description, location,
and requirements
Finishes required for the restaurant include all of the below except ___. -
answerlandscaping
For this project, Division 15 is for ___. - answerMechanical, Plumbing, and HVAC
For this project, Division 16 is for ___. - answerElectrical
For the Wendy's project, the proposed underground electrical and phone will cross ___.
- answerstorm and sanitary sewer piping
What room number has the electrical panels? - answer110
Which panel contains the starters? - answerCP
How many lighting contactors are required? - answer5
What is the total connected load amps? - answer548
Which panel has the contactors for the fryer? - answernone of these
On sheet 11, the receptacle heights shown are ___. - answerto the center of the box
On the electrical distribution drawing, the power distribution system is labeled "power
riser." Other projects may call this a ___. - answerone-line diagram
SCCR is the acronym for ___. - answershort circuit current rating
CP is the acronym for ___. - answercontrol panel
Colors of switches, receptacles, and cover plates are typically found on the ___. -
answerarchitectural drawing
For this project, electrical specifications on the plumbing plans call for use of ___. -
answerrigid or PVC
Where there are discrepancies between specifications and the drawings, ___. -
answerspecifications take precedence over the drawings
On this project, Division 1 contains ___. - answeroverall project description, location,
and requirements
Finishes required for the restaurant include all of the below except ___. -
answerlandscaping
For this project, Division 15 is for ___. - answerMechanical, Plumbing, and HVAC
For this project, Division 16 is for ___. - answerElectrical
For the Wendy's project, the proposed underground electrical and phone will cross ___.
- answerstorm and sanitary sewer piping
What room number has the electrical panels? - answer110
Which panel contains the starters? - answerCP
How many lighting contactors are required? - answer5
What is the total connected load amps? - answer548
Which panel has the contactors for the fryer? - answernone of these
On sheet 11, the receptacle heights shown are ___. - answerto the center of the box