1. Introduction 
1.1 Project goals and objectives 
The Getta Byte Software project is a mission that is formed with the main goal in mind of 
substituting the on-going manual online-based billing system that will enable a concise, easy, and 
fast data entry system. It is worth noting that the existing system has the capability of helping the 
company to carry out the duties in daily operations. This is quite fine, but there are a few 
challenges that call for an online system. The first concern ...
-
Week8_MGMT404 Final Course Project Plan MGMT 404: Project Management
- Other • 42 pages • 2023
-
- $15.49
- + learn more
Executive Summary 
Coffee has turned into a prevalent refreshment where it isn't simply required in the 
mornings however for the day, regardless of whether they are en route to work or just to sit 
and unwind. Anarki Coffee Shop will be a spot that serves standard and strength espresso, 
and little baked good things that are situated in a conspicuous neighborhood close to a train 
station or a high pedestrian activity zone. It is unprecedented to discover an espresso place 
that has a warm, ho...
-
MGMT 404 MGMT 404 Getta Byte Software Project Charter
- Other • 4 pages • 2023
-
- $11.99
- + learn more
Getta Byte Software Project Charter 
Getta Byte stated few basic information required for a good project charter. They 
identified the reason for needing a new billing system and who they wanted to consult in 
order to get the job done, we swell as a budget for doing so. They also mentioned the 
risks of transmitting data into the new system and working with such a tight budget. 
However, the team failed to discuss high level project approval requirements, and 
selecting a project manager. 
As t...
-
Getta_Byte_Software_project Week 4 Week 4: Course Project Part 2
- Other • 14 pages • 2023
-
- $14.49
- + learn more
Getta Byte Software project 
1.1 Project goals and objectives 
The Getta Byte Software project is a mission that is formed with the main goal in mind of 
substituting the on-going manual online-based billing system that will enable a concise, easy, and 
fast data entry system. It is worth noting that the existing system has the capability of helping the 
company to carry out the duties in daily operations. This is quite fine, but there are a few 
challenges that call for an online system. The fi...
-
MGMT 404: Project Management/Week8_MGMT404 Final Course Project Plan
- Exam (elaborations) • 42 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
1. EXECUTIVE SUMMARY...................................................................................................3 
2. PROJECT CHARTER.......................................................................................................6 
3. PROJECT SCOPE STATEMENT....................................................................................11 
4. WORK BREAKDOWN STRUCTURE / PROJECT SCHEDULE....................................25 
5. RISK MANAGEMENT PLAN..................................
As you read this, a fellow student has made another $4.70
-
MGMT 404 Felix_Lopez_Getta_Byte_Software_project_Final/MGMT404 Week 8: Course Project Part 4 (GRADED A) | UPDATED 2023
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
Contents 
1. Introduction 3 
1.1 Project goals and objectives 3 
1.2 Management of the project 4 
1.3 Internal and external factors that may affect the processes and procedure of the project 5 
1.4 Project Charter 6-9 
2 Stakeholder Engagement Plan 10-11 
3 Communication management plan 11-12 
4 Project Scope Statement 13-16 
5 WBS And the Project Schedule 17 
5.1 WBS 18 
5.2 Project scheduling 19 
Getta Byte Software project 
5.3 Gantt Chart 20 
6 Resource Allocation and Budget Reports 21 
 7 E...
-
MGMT 404 Complete Course Projects, week 1,2,3,4,6,and 8 Assignments, Discussions, Quizzes, Midterm (Bundle) and final exam ,(GRADED A) | UPDATED 2023
- Package deal • 7 items • 2023
-
- $35.49
- + learn more
MGMT 404 Complete Course Projects, week 1,2,3,4,6,and 8 Assignments, Discussions, Quizzes, Midterm (Bundle) and final exam ,(GRADED A) | UPDATED 2023
-
MGMT 404 Getta Byte Software Project Charter/Getta Byte Software Project Charter MGMT 404
- Other • 4 pages • 2023
- Available in package deal
-
- $9.49
- + learn more
Getta Byte Software Project Charter 
Getta Byte stated few basic information required for a good project charter. They 
identified the reason for needing a new billing system and who they wanted to consult in 
order to get the job done, we swell as a budget for doing so. They also mentioned the 
risks of transmitting data into the new system and working with such a tight budge
-
Getta_Byte_Software_project Week 4/MGMT404 Week 4: Course Project Part 2
- Other • 14 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
Contents 
1. Introduction 3 
1.1 Project goals and objectives 3 
1.2 Management of the project 4 
1.3 Internal and external factors that may affect processes and procedure of the project 4 
2 Stakeholder Engagement Plan 10 
3 Communication management plan 11 
4 Project Scope Statement 13 
1. Introduction 
Getta Byte Software project 
1.1 Project goals and objectives 
The Getta Byte Software project is a mission that is formed with the main goal in mind of 
substituting the on-going manual online...
-
MGMT 404 Week 6 Course Project Part 3 (Includes Sections E and F); The Getta Byte – New Billing System Project (GRADED A) | UPDATED 2023
- Other • 21 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
GETTA BILL SOFTWARE – BILLING SYSTEM PROJECT 
Introduction 
Getta Bill Software will be replacing the current billing system with a cloud-based system 
that is accurate and easy to use that reduces billing errors by 15%. The goal is to have ease of 
use software and to improve the transaction speed by 30%, while also implementing dynamic 
reporting. The goal is to complete the development of the project by August 15, migrate customer 
data to cloud by August 25, have the first pilot completed ...